Kaloti Precious Metals-Morning Market Report-Thursday, March 2, 2017

게시됨: Mar 2, 2017 15:51
Gold Miners Running to Stand Still After Cuts, Franco CEO Says.

By 

ScrapMonster Author

Gold Miners Running to Stand Still After Cuts, Franco CEO Says.

 

 

 

 

 

 

 

 

 

 

 

OTC Trading Range For

All Times Are

As Per Dubai

Date

02/03/2017

 

01/03/2017

 

 

Gold

Silver

 

Platinum

Palladium

 

Open At 03.00

 

$1,248.47

$18.13

 

$1,024.31

 

$771.80

 

High Bid

 

$1,250.73

$18.46

 

$1,028.15

 

$782.60

 

Low Offer

 

$1,237.01

$18.23

 

$1,012.20

 

$769.48

 

Close At 02.00

 

$1,249.69

$18.42

 

$1,016.28

 

$777.38

 

Previous Close

 

$1,248.44

$18.31

 

$1,024.27

 

$770.95

 

Daily Change USD

$1.25

$0.11

 

($7.99)

 

$6.43

 

Daily Change %

 

0.10%

0.60%

 

-0.79%

 

0.83%

 

London Fixings

AM

$1,246.05

**

 

$1,026.00

 

$783.00

 

 

PM

$1,240.40

$18.33

 

$1,029.00

 

$781.00

 

COMEX Trading Volume

304414

76370

 

18556

 

4799

 

Active Month Settlement

$1,250.00

$18.48

 

$1,018.90

 

$779.00

 

Previous Session

 

$1,253.90

$18.46

 

$1,031.00

 

$771.70

 

Daily Change

 

($3.90)

$0.02

 

($12.10)

 

$7.30

 

EFP's

 

1.4/1.7

4/7

 

0/2

 

0/1

 

Forwards & Options

1 Month

3 months

 

6 months

12 months

 

GOFO

 

-

-

 

 

-

 

-

 

USD LIBOR

 

0.78889

1.064

 

1.37489

 

0.00000

 

Gold ATM Vols

 

12.430

14.140

 

14.89

 

15.8

 

Silver ATM Vols

 

18.94

21.33

 

23.24

 

24.92

 

Platinum ATM Vols

17.750

17.350

 

17.950

 

18.270

 

Palladium ATM Vols

27.050

25.850

 

26.000

 

25.900

 

Market Daily & Weekly

Market Snap Shot

 

01/03/2017

 

1 Day%

 

1 Week %

 

XAU

 

 

$1,249.69

 

 

0.10

 

0.98

 

XAG

 

 

$18.42

 

 

0.60

 

2.17

 

XPT

 

 

$1,016.28

 

 

-0.79

 

1.23

 

XPD

 

 

$777.38

 

 

0.83

 

1.05

 

Euro

 

 

1.0547

 

 

-0.27

 

-0.10

 

Note: Indications only, open and closing prices are bids; Data source: Bloomberg; Times as per Dubai

Fundamentals and News

Gold Miners Running to Stand Still After Cuts, Franco CEO Says

The world’s gold miners will be running on the spot for years to come as a surge in gold prices sends them scrambling to secure new production from less profitable projects, according to the largest mine streaming and royalty company.

 

“In my mind, the industry is ex-growth,” said David Harquail, chief executive officer of Franco-Nevada Corp.

 

After a downturn that squeezed capital investments, most gold producers have no choice but to invest in new projects as existing mines are depleted, Harquail said Wednesday in an interview.

They’ll be faced with options that are, cumulatively, unlikely to boost global gold production or lower the sector’s overall costs.

 

“None of those projects are really great,” Harquail said at the BMO Capital Markets mining conference in Florida. “They would have been built by now if they were.”

 

As a result, Harquail said Franco-Nevada plans to do more deals in the non-precious metals space, with a particular focus on oil and gas. The company’s mandate allows it to have as much as a fifth of its portfolio outside precious metals, and he would like to deploy capital to get to that level soon. Currently 94 percent of Franco-Nevada’s holdings are in precious metals, he said.

 

Gold, which posted four straight weekly gains through Friday, has been thrown into reverse amid a rapid rethink by investors about whether the Federal Reserve could move on interest rates this month. The metal extended its losing streak to a third day as signs of a strengthening U.S. economy diminished haven demand. The yield on two-year Treasuries reached the highest Wednesday on an intraday basis since 2009, after eclipsing its 2016 high.

 

The world’s biggest copper producer has some good news for bulls: it won’t be tempted into speeding up projects as prices rally.

 

What’s more, Codelco Chairman Oscar Landerretche says a series of natural obstacles facing the industry will also prevent other miners from piling in.

 

“It’s going to be very difficult for the industry to respond even if it wanted to,” Landerretche said Tuesday in an interview at the BMO Capital Markets mining conference in Florida. “It’s becoming very, very hard to do new projects.”

 

Data Forthcoming Releases

 

 

 

 

 

 

 

 

 

Time

Country

Today's Events

Forecast

Previous

Actual

 

 

5:30pm

USD

Unemployment Claims

243K

244K

 

 

 

 

 

 

 

 

*Dubai Time

 

Courtesy: http://kalotipm.com.sg/kaloti-market-report-2nd-march-2017

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
모로코 부마딘 다금속 광산의 경제성 개선
4시간 전
모로코 부마딘 다금속 광산의 경제성 개선
더 보기
모로코 부마딘 다금속 광산의 경제성 개선
모로코 부마딘 다금속 광산의 경제성 개선
4시간 전
그린란드 마인스, 스카에르가드 PGM 프로젝트에서 104.8톤 벌크 샘플링 프로그램 완료
7시간 전
그린란드 마인스, 스카에르가드 PGM 프로젝트에서 104.8톤 벌크 샘플링 프로그램 완료
더 보기
그린란드 마인스, 스카에르가드 PGM 프로젝트에서 104.8톤 벌크 샘플링 프로그램 완료
그린란드 마인스, 스카에르가드 PGM 프로젝트에서 104.8톤 벌크 샘플링 프로그램 완료
[SMM 속보] Greenland Mines는 동그린란드의 Skaergaard 팔라듐-백금-금 프로젝트에서 7개 지점에 걸쳐 104.8톤 규모의 벌크 샘플링 프로그램을 완료했다. 샘플은 핀란드 GTK Mintec에서 대규모 및 파일럿 규모의 제련 시험을 위해 준비 중이며, 회사는 프로젝트 기술 평가 진전을 목표로 엔지니어링, 가공, 인프라 및 폐기물 관리 연구를 계속하고 있다. Greenland Mines에 따르면 Skaergaard의 S-K 1300 자원량은 현재 약 1,500만 온스 PdEq 확정 자원량과 1,749만 온스 PdEq 추정 자원량으로 구성되어 있다. 벌크 테스트 프로그램은 남아프리카, 짐바브웨, 러시아 주요 공급 지역 외곽의 대규모 미개발 팔라듐-백금-금 시스템 중 하나에 대한 가공 및 회수 옵션을 평가하는 중요한 단계다. 다만 보고된 광물자원량은 광물매장량이 아니며, 이번 프로그램은 개발 또는 상업적 생산 결정을 의미하지 않는다.
7시간 전
투 리버스, 메렌스키 프로젝트 검증 작업 진전, 연간 6E 18만 2,000온스 생산 가능
7시간 전
투 리버스, 메렌스키 프로젝트 검증 작업 진전, 연간 6E 18만 2,000온스 생산 가능
더 보기
투 리버스, 메렌스키 프로젝트 검증 작업 진전, 연간 6E 18만 2,000온스 생산 가능
투 리버스, 메렌스키 프로젝트 검증 작업 진전, 연간 6E 18만 2,000온스 생산 가능
[SMM Flash] 아프리칸 레인보우 미네랄스와 임팔라 플래티넘의 남아프리카 PGM 합작법인인 투 리버스가 부시벨트 콤플렉스 동부 지역의 메렌스키 프로젝트에 대한 기술 검증 작업을 진행 중이다. FY2026 기간 중 프로젝트의 향후 방향을 결정하는 데 필요한 연구를 완료하기 위해 초기 작업 자본이 승인되었다. 메렌스키 선광기는 2024년 12월까지 6개월 동안 시운전을 마쳤으나, 이후 어려운 PGM 시장 여건 속에서 관리·유지 상태로 전환되었다. 이 프로젝트의 자본 비용은 약 73억 랜드로 명시되어 있으며, 정상 상태에서 연간 약 182,000온스의 6E PGM과 함께 연간 약 1,600톤의 니켈, 1,300톤의 구리를 생산하도록 설계되었다. 따라서 재가동 시 기존 남아프리카 운영에서 상당한 추가 PGM 공급이 가능할 수 있다. 그러나 이 프로젝트는 여전히 기술 검증 단계에 있으며, 재가동 일정이나 생산 재개에 대한 최종 결정은 발표되지 않았다.
7시간 전