Newssummary: Chihong Mining Lead&Zinc Project in Inner Mongolia Close on Environmental Concerns

게시됨: Apr 30, 2015 15:00
Hulunbuir Chihong Mining’s lead&zinc project closed for failing to meet environmental protection standards, local news reported Apr. 29.

SHANGHAI, Apr. 30 (SMM) – Hulunbuir Chihong Mining’s lead&zinc project closed for failing to meet environmental protection standards, local news reported Apr. 29. 

Another company, named Hunan Hengyang Meilun Co.’s lead & zinc project, is also in the list of 2124 projects across the nation that violates environmental protection laws. 

News earlier reported that Hulunbuir Chihong Mining Co. succeeded in producing zinc ingot at its 200,000-tpy lead&zinc production line in Dec. 2014. 

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
 
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn