Tender Notice for the Public Tender of No. 2 Titanium Metal Petroleum Coke in March

Published: Mar 12, 2026 11:01

1. Tender Conditions

The tender project March Titanium Metal Petroleum Coke No. 2 Public Tender (PGWZMYHGZHD260310272703) had the Bid Inviter as the Materials Division of Pangang Group Material Trading Co., Ltd. The funds for the tender project came from self-raised sources. The project had met the tender conditions, and a public tender was now being conducted.

2. Project Overview and Tender Scope

2.1 Project Name: March Titanium Metal Petroleum Coke No. 2 Public Tender

2.2 Alternative Procurement Method Upon Tender Failure: Negotiated procurement

2.3 For the tender content, scope, and scale of this project, please refer to the attachment "Material List Attachment.pdf" for details.

3. Bidder Qualification Requirements

3.1 Consortium bidding was not permitted for this tender.

3.2 This tender required bidders to meet the following qualification requirements:

See the attachment for details (if necessary).

3.3 This tender required bidders to meet the following registered capital requirement:

Manufacturer registered capital: 6 million yuan or above

3.4 This tender required bidders to meet the following performance requirements:

When submitting bids, bidders were required to provide proof of performance for petroleum coke products from 2022.1.1 to the bid submission deadline (scanned copies of invoices; if no Pangang supply performance was uploaded, the bidder would be deemed a new supplier).

3.5 This tender required bidders to meet the following capability requirements, financial requirements, and other requirements:

Financial requirement: registered capital ≥ 6 million yuan

Capability requirement: provide valid enterprise qualification certificates, namely scanned copies of the original or duplicate business license;

Other requirements: see the attachment for details (if necessary).

3.6 For projects that must be tendered in accordance with the law, bids submitted by dishonest persons subject to enforcement were invalid.

4. Acquisition of Tender Documents

4.1 Any interested bidder shall, from 08:45 on March 12, 2026 to 08:45 on April 1, 2026 (Beijing time, the same hereinafter), log in to the Angang Smart Tendering and Bidding Platform at http://bid.ansteel.cn to download the electronic tender documents.

Click to View Tender Details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Contract Is About to Roll Over, Spot Aluminum Shows No Signs of Improvement [SMM South China Spot Aluminum Daily Review]
12 hours ago
Contract Is About to Roll Over, Spot Aluminum Shows No Signs of Improvement [SMM South China Spot Aluminum Daily Review]
Read More
Contract Is About to Roll Over, Spot Aluminum Shows No Signs of Improvement [SMM South China Spot Aluminum Daily Review]
Contract Is About to Roll Over, Spot Aluminum Shows No Signs of Improvement [SMM South China Spot Aluminum Daily Review]
12 hours ago
[SMM Aluminum Flash News] Capral Aluminum Electrifies Furnace, Boosting Efficiency to 90% and Cutting Emissions
12 hours ago
[SMM Aluminum Flash News] Capral Aluminum Electrifies Furnace, Boosting Efficiency to 90% and Cutting Emissions
Read More
[SMM Aluminum Flash News] Capral Aluminum Electrifies Furnace, Boosting Efficiency to 90% and Cutting Emissions
[SMM Aluminum Flash News] Capral Aluminum Electrifies Furnace, Boosting Efficiency to 90% and Cutting Emissions
Capral Aluminum is replacing a 40-year-old gas furnace at its Queensland site with an electric system, including an electric convection furnace, induction heating and waste heat recovery. Efficiency is expected to rise from about 20% to over 90%, while cutting Scope 1 emissions by around 973 tones per year, about 9% of total emissions. The project, supported by AUD 3.45 million from ARENA, is targeted for commissioning in early 2027. The company said electrification will reduce emissions and fuel costs while improving operational stability and product consistency, and could serve as a reference for low-carbon upgrades in aluminum processing.
12 hours ago
SHFE Cast Aluminum Alloy Warrants Up 62 mt to 30,496 mt on April 15
12 hours ago
SHFE Cast Aluminum Alloy Warrants Up 62 mt to 30,496 mt on April 15
Read More
SHFE Cast Aluminum Alloy Warrants Up 62 mt to 30,496 mt on April 15
SHFE Cast Aluminum Alloy Warrants Up 62 mt to 30,496 mt on April 15
[SMM Express] SHFE data showed that on April 15, the total registered cast aluminum alloy warrants stood at 30,496 mt, an increase of 62 mt from the previous trading day. By region, Shanghai registered 1,822 mt (down 90 mt), Guangdong 11,786 mt (down 60 mt), Jiangsu 3,909 mt (down 29 mt), Zhejiang 8,170 mt (up 151 mt), Chongqing 3,603 mt (unchanged), and Sichuan 1,206 mt (unchanged) from the previous trading day.
12 hours ago
Tender Notice for the Public Tender of No. 2 Titanium Metal Petroleum Coke in March - Shanghai Metals Market (SMM)