Pengadaan Gulungan Baja Canai Dingin Angang Putian 2601 Tender

Telah Terbit: Jan 23, 2026 09:46

1. Kondisi Pengadaan

Proyek pengadaan ini, Pengadaan Gulungan Baja Canai Dingin Angang Putian 2601 (AGLZPTHGXHD260122264803), memiliki entitas pengadaan sebagai Departemen Pemasaran PT Angang Cold Rolled Steel Sheet (Putian). Dana proyek pengadaan bersumber dari dana mandiri. Proyek telah memenuhi kondisi pengadaan dan kini melakukan permintaan penawaran dan perbandingan terbuka.

2. Gambaran Proyek dan Ruang Lingkup Pengadaan

2.1 Nama Proyek: Pengadaan Gulungan Baja Canai Dingin Angang Putian 2601

2.2 Alih Metode Pengadaan Lain Setelah Pengadaan Gagal: Beralih ke Pengadaan Negosiasi

2.3 Konten, ruang lingkup, dan skala pengadaan spesifik untuk proyek ini dirinci dalam lampiran "Lampiran Daftar Material.pdf".

3. Persyaratan Kualifikasi Penyedia

3.1 Penawaran konsorsium tidak diizinkan untuk pengadaan ini.

3.2 Pengadaan ini mensyaratkan penyedia memiliki kualifikasi berikut:

(1) Izin usaha untuk tipe manufaktur

(2) Sertifikasi sistem manajemen mutu untuk tipe manufaktur (ISO9000)

3.3 Pengadaan ini mensyaratkan penyedia memenuhi ketentuan modal dasar berikut:

Modal dasar untuk tipe manufaktur: 300,0 (10.000 yuan) ke atas

3.4 Pengadaan ini mensyaratkan penyedia memiliki persyaratan kinerja berikut:

Sediakan satu catatan kinerja penyediaan gulungan baja baru ke perusahaan baja dari tahun 2023 hingga sekarang (berikan kontrak dan faktur PPN yang sesuai)

3.5 Pengadaan ini mensyaratkan penyedia memiliki persyaratan kemampuan, keuangan, dan persyaratan lain berikut:

Persyaratan keuangan: Detail lihat lampiran (jika diperlukan)

Persyaratan kemampuan: Detail lihat lampiran (jika diperlukan)

Persyaratan lain: Detail lihat lampiran (jika diperlukan)

3.6 Pengadaan ini menetapkan bahwa untuk proyek yang menurut hukum harus melalui tender, penawaran dari orang yang tercatat tidak terpercaya karena pelaksanaan ketidakjujuran adalah tidak valid.

4. Perolehan Dokumen Pengadaan

4.1 Setiap penyedia yang berminat, silakan login ke Platform Tender dan Penawaran Cerdas Angang di http://bid.ansteel.cn dari pukul 17:00 tanggal 22 Januari 2026 hingga pukul 13:00 tanggal 30 Januari 2026 (Waktu Beijing, sama di bawah) untuk mengunduh dokumen pengadaan elektronik.

Klik untuk melihat detail tender:

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Sasol Plans to Cut External Coal Purchases in FY2027 and Raise Own-Mine Output to 34 Million Tons by 2028】
1 menit yang lalu
【Sasol Plans to Cut External Coal Purchases in FY2027 and Raise Own-Mine Output to 34 Million Tons by 2028】
Baca Selengkapnya
【Sasol Plans to Cut External Coal Purchases in FY2027 and Raise Own-Mine Output to 34 Million Tons by 2028】
【Sasol Plans to Cut External Coal Purchases in FY2027 and Raise Own-Mine Output to 34 Million Tons by 2028】
South Africa’s Sasol plans to increase investment in its own coal mines to secure feedstock for its Secunda Operations while reducing coal purchases from third-party suppliers. The company produced 28.4 million tons of coal from its own mines in FY2026 and expects this to increase to between 30 million and 32 million tons in FY2027, before rising further to 34 million tons by 2028. Meanwhile, Sasol expects its external coal purchases to decline from 8.8 million tons in FY2026 to between 5 million and 7 million tons in FY2027. This represents a reduction of between 1.8 million and 3.8 million tons, or approximately 20.5% to 43.2%. The change primarily reflects Sasol’s substitution of externally purchased coal with own-mine production and does not indicate an equivalent decline in its overall coal requirements. The company said that increasing the share of own-mine coal would help maintain consistent coal quality, secure feedstock supplies and improve cost competitiveness. Sasol invested R1 billion to convert the Twistdraai export-coal washing plant into a destoning facility. The facility is now delivering processed coal with sinks below 12%. Improved coal quality, higher gasifier availability and the absence of a shutdown in FY2026 collectively supported an increase in annual output at Secunda Operations to a five-year high of 7.2 million tons. With a scheduled shutdown planned for FY2027, the company expects the facility to produce between 7.2 million and 7.4 million tons during the year. Mining capital expenditure increased from R2.9 billion in FY2024 to R4.1 billion in FY2026 and is expected to rise by a further R1 billion to R1.5 billion in FY2027, including investment in a shaft-replacement project. In addition, Sasol is assessing the production of methane-rich gas from coal as a bridge supply for industrial customers that could face a gas supply shortage from 2028 onward. However, the project still requires greater long-term pricing certainty and further regulatory assessment, and the company has not yet made a final investment decision.
1 menit yang lalu
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
2 menit yang lalu
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
Baca Selengkapnya
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
Indian integrated logistics and engineering services company Sical Logistics has secured a five-year mining contract worth approximately ₹5.3473 billion from Central Coalfields Limited for heavy earth-moving and mining operations at the SDOC Mine in Bokaro district, Jharkhand. The contract covers the re-handling of approximately 20.14 million cubic metres of overburden, the removal of around 33.65 million cubic metres of hard overburden, and the extraction of approximately 9.104 million tonnes of coal from a 143-hectare working area. The contract value includes an 18% goods and services tax, while the execution period is 1,825 days. A simple five-year average would place the contracted coal volume at approximately 1.82 million tonnes per year.
2 menit yang lalu
【ECL India Mulai Penyegelan Pencegahan di Tambang Khandra】
2 menit yang lalu
【ECL India Mulai Penyegelan Pencegahan di Tambang Khandra】
Baca Selengkapnya
【ECL India Mulai Penyegelan Pencegahan di Tambang Khandra】
【ECL India Mulai Penyegelan Pencegahan di Tambang Khandra】
Eastern Coalfields Limited (ECL) menyatakan pada 31 Agustus bahwa pihaknya telah memulai langkah penyegelan pencegahan di Tambang Khandra di sabuk batu bara Raniganj. Retakan permukaan dan penurunan tanah pertama kali teramati di dekat Kuil Nikanth pada 28 Juli. ECL menyatakan bahwa bangunan tidak berizin dan penghuni ilegal di area terdampak telah membatasi pekerjaan pengisian permukaan. Karena retakan tidak dapat diisi dengan baik, udara luar dapat masuk ke dalam lubang bawah tanah, memperparah pemanasan spontan batu bara sisa, dan semakin meningkatkan risiko pembakaran spontan. Oleh karena itu, ECL memulai langkah penyegelan untuk melindungi karyawan dan area sekitarnya serta akan terus memantau kondisi di lokasi. Karyawan yang ada akan dialihkan ke unit lain di tambang yang sama atau tambang terdekat sesuai kebutuhan operasional. Langkah penyegelan tidak akan mengganggu pasokan air atau listrik yang ada ke perumahan karyawan. ECL belum menentukan berapa lama penyegelan akan diberlakukan dan menolak laporan yang menyebutkan bahwa tambang tersebut dapat disegel selama tiga bulan. Durasi akhir akan ditentukan berdasarkan saran ahli, penilaian teknis, dan persyaratan keselamatan tambang yang berlaku.
2 menit yang lalu
Pengadaan Gulungan Baja Canai Dingin Angang Putian 2601 Tender - Shanghai Metals Market (SMM)