【Jinchuan Group's 200,000-ton Lithium Iron Phosphate Project Enters Full Construction Phase】In early June, an exciting news came from Lanzhou New Area: the foundation construction phase of Jinchuan Group's 200,000 tons per annum (tpa) lithium iron phosphate (LFP) production line project has been successfully completed, officially entering the full construction phase.
The project is implemented and constructed by Gansu Jinlin Lithium-ion Battery New Material Co., Ltd., a holding subsidiary of Lanzhou Jinchuan Science and Technology Park Co., Ltd. Located in the New Material Industrial Park of Lanzhou New Area, the project covers an area of approximately 360 mu (about 24 hectares), with an overall planned production capacity of 200,000 tons per annum of lithium-ion battery materials based on phosphate chemistry. It is planned to be constructed in two phases, each with a capacity of 100,000 tons per annum. The product positioning is a new generation of high-density lithium iron phosphate with both automotive power battery and energy storage battery requirements met, which will inject strong momentum into the development of new energy vehicles.
![Harga Magnesium Naik Tiga Sesi Berturut-turut! Sisi Biaya Tetap "Membara" Sementara Sisi Permintaan Kesulitan Mengambil Alih [Komentar SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)


