GAC Energy’s Hunan subsidiary plans to build 300 EV charging stations in 3 years

Telah Terbit: May 9, 2024 20:52
Sumber: gasgoo
On May 6, GAC Energy Technology (Hunan) Co., Ltd. was officially incorporated, marking a significant milestone in GAC Group's strategic business expansion in Hunan province, according to a press relea...

Shanghai (Gasgoo)- On May 6, GAC Energy Technology (Hunan) Co., Ltd. was officially incorporated, marking a significant milestone in GAC Group's strategic business expansion in Hunan province, according to a press release from GAC Group.

This development follows the establishment of GAC AION's third factory located in Changsha city and represents a major advancement in GAC Energy Technology Co., Ltd.'s initiatives within the energy sector.

The newly registered company will concentrate its efforts in Changsha city and broaden its impact throughout Hunan province, said GAC Group. Over the next three years, the company plans to build 300 electric vehicle charging stations and develop an integrated energy supply network that includes solar power, energy storage, charging, and battery swapping facilities. This network will be supported by ongoing technological research and development. Furthermore, the company is set to establish a digital platform to explore innovative business models, such as energy trading and green energy utilization, and to develop a smart energy ecosystem centered on Vehicle-to-Grid (V2G) technologies.

In recent years, spurred by a new wave of technological revolutions and the China’s dual-carbon strategy, the ownership of new energy vehicles has been on the rise. Many local governments have drafted plans and set standards for the construction of local electric vehicle charging and battery swapping infrastructure. As part of this movement, the Development and Reform Commission of Changsha City has released the "Implementation Plan for Accelerating the Construction of Charging Infrastructure to Promote the Consumption of New Energy Vehicles (2023-2025)." This plan aims to install at least 163,000 units of charging facilities in the city by 2025, including no fewer than 38,000 public charging points, thereby advancing the construction of public charging infrastructure and optimizing its development mechanisms.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[Baterai Solid-State: Tianneng Co., Ltd. Mencapai Pengiriman Skala Besar Sel Baterai Semi-Solid-State 314Ah, dengan Terobosan Bertahap di Berbagai Sistem Teknologi]
7 jam yang lalu
[Baterai Solid-State: Tianneng Co., Ltd. Mencapai Pengiriman Skala Besar Sel Baterai Semi-Solid-State 314Ah, dengan Terobosan Bertahap di Berbagai Sistem Teknologi]
Baca Selengkapnya
[Baterai Solid-State: Tianneng Co., Ltd. Mencapai Pengiriman Skala Besar Sel Baterai Semi-Solid-State 314Ah, dengan Terobosan Bertahap di Berbagai Sistem Teknologi]
[Baterai Solid-State: Tianneng Co., Ltd. Mencapai Pengiriman Skala Besar Sel Baterai Semi-Solid-State 314Ah, dengan Terobosan Bertahap di Berbagai Sistem Teknologi]
[Baterai solid-state: Tianneng Battery mencapai pengiriman skala besar sel baterai semi-solid-state 314Ah, dengan sistem multi-teknologi mencapai terobosan bertahap] Pada 28 Agustus 2026, Tianneng Battery mengungkapkan dalam laporan semester pertama 2026 bahwa sel baterai semi-solid-state 314Ah yang diproduksi bekerja sama dengan WELION New Energy telah mencapai pengiriman batch skala besar dan berhasil diterapkan pertama kali pada peralatan ESS sisi jaringan. Perusahaan telah menyusun beberapa jalur teknologi baterai tipe baru, termasuk baterai solid-state, baterai ion natrium, dan sel bahan bakar hidrogen, dan sistem multi-teknologi "litium-litium-hidrogen-natrium + solid-state" sedang dipercepat pembentukannya, dengan proses industrialisasi menunjukkan perkembangan bertahap berupa "demonstrasi dan verifikasi baterai ion natrium, penerapan baterai solid-state di berbagai skenario, dan percepatan komersialisasi bahan bakar hidrogen". Bisnis baterai litium perusahaan telah secara signifikan mempercepat upayanya untuk go global, dengan ESS residensial di luar Tiongkok sebagai arah terobosan utama. Untuk data keuangan semester pertama yang spesifik, silakan merujuk pada laporan lengkap. Baterai semi-solid-state: baterai padat-cair.
7 jam yang lalu
[Baterai Solid-State: EcoPro BM Membangun Tim Baterai All-Solid-State yang Mencakup Rantai Penuh “Bahan Baku-Material-Sel Baterai,” Menargetkan Komersialisasi pada 2027]
7 jam yang lalu
[Baterai Solid-State: EcoPro BM Membangun Tim Baterai All-Solid-State yang Mencakup Rantai Penuh “Bahan Baku-Material-Sel Baterai,” Menargetkan Komersialisasi pada 2027]
Baca Selengkapnya
[Baterai Solid-State: EcoPro BM Membangun Tim Baterai All-Solid-State yang Mencakup Rantai Penuh “Bahan Baku-Material-Sel Baterai,” Menargetkan Komersialisasi pada 2027]
[Baterai Solid-State: EcoPro BM Membangun Tim Baterai All-Solid-State yang Mencakup Rantai Penuh “Bahan Baku-Material-Sel Baterai,” Menargetkan Komersialisasi pada 2027]
[Baterai Solid-State: EcoPro BM Bentuk Tim Baterai All-Solid-State yang Mencakup Rantai Penuh "Bahan Baku-Material-Sel Baterai", Targetkan Komersialisasi pada 2027] Pada 26 Agustus 2026, EcoPro BM menggelar rapat kick-off di Provinsi Gyeonggi, secara resmi membentuk "tim baterai all-solid-state" yang mencakup rantai penuh "bahan baku-material-sel baterai". Proyek ini dipimpin oleh Kementerian Perdagangan, Industri, dan Energi Korea Selatan, dan EcoPro BM terpilih pada awal Agustus, bersama empat perusahaan lain, sebagai perusahaan "subkontraktor super" fase ketiga. Peserta tim meliputi Institut Teknologi Elektronika Korea (KETI), Institut Sains dan Teknologi Korea (KIST), Universitas Sains dan Teknologi Pohang (POSTECH), Universitas Hanyang, dan lainnya. EcoPro BM berencana mengembangkan elektrolit padat berbasis sulfida dari litium sulfida kemurnian tinggi, dengan target komersialisasi baterai all-solid-state berbasis sulfida pada 2027. Dilaporkan oleh Kantor Berita Yonhap dan media Korea Selatan lainnya pada 31 Agustus.
7 jam yang lalu
Terra Charge Akan Luncurkan Stasiun EV Kompatibel Tesla di Jepang mulai 2028
31 Aug 2026 11:41
Terra Charge Akan Luncurkan Stasiun EV Kompatibel Tesla di Jepang mulai 2028
Baca Selengkapnya
Terra Charge Akan Luncurkan Stasiun EV Kompatibel Tesla di Jepang mulai 2028
Terra Charge Akan Luncurkan Stasiun EV Kompatibel Tesla di Jepang mulai 2028
Terra Charge Jepang akan meluncurkan stasiun pengisian daya EV yang kompatibel dengan Tesla, dengan pemasangan peralatan standar Tesla dijadwalkan dimulai pada tahun fiskal 2028.
31 Aug 2026 11:41