The Jilin Provincial People's Government has issued the "Implementation Plan for Seizing the New Track of New Energy Storage Industry" and proposed a series of measures to promote the development of the new energy storage industry. The plan stipulates that, starting from 2023, newly added new energy projects will, in principle, be equipped with energy storage facilities with a capacity of 15% of the installed capacity, and the charging duration should not be less than 2 hours, while encouraging the use of centralized sharing. In addition, the capacity ratio and charging duration of new energy projects connected to the market will be moderately increased.
The plan also sets specific targets: striving to achieve a new energy storage capacity of over 500,000 kilowatts by the end of the "14th Five-Year Plan" period in Jilin Province, with a comprehensive energy storage duration of not less than 2 hours, achieving the transition of the new energy storage industry from the initial stage of commercialization to large-scale development.
![Harga Magnesium Naik Tiga Sesi Berturut-turut! Sisi Biaya Tetap "Membara" Sementara Sisi Permintaan Kesulitan Mengambil Alih [Komentar SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)


