Recently, the 2.26MW distributed photovoltaic project of Guangdong Yadi Motor Co., Ltd. constructed by Yingliyuan Shengjian Construction Co., Ltd. has started construction. The installed capacity of the project is 2.2538MW, and the annual power generation is about 2,270,975.9 kWh, which will effectively help the enterprise green development and serve the region's energy saving and carbon reduction.
It is understood that the project is located in Fogang County, Qingyuan City, Guangdong Province. The solar power generated is continuously increasing the proportion of green electricity in the factory electricity consumption through self-generation and self-use, grid-connected mode, effectively reducing the energy consumption cost of enterprises. At the same time, by providing sustainable green kinetic energy for factory production, manufacturing and operation, it further reduces the carbon footprint of the factory and sets a green manufacturing model.
![Harga Magnesium Naik Tiga Sesi Berturut-turut! Sisi Biaya Tetap "Membara" Sementara Sisi Permintaan Kesulitan Mengambil Alih [Komentar SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)


