The Tongling Special Material 10,000-ton lithium ion battery negative electrode material production line project consists of graphitization workshop, pre-carbonization workshop, finished product processing and transfer workshop, solid and hazardous waste temporary storage warehouse.
The graphitization workshop is a multi-span single-layer steel frame workshop with a building area of 17,999.16 square meters and a building height of 24.75 meters;
The pre-carbonization workshop is a single-span single-layer steel frame workshop with a building area of 7,021.58 square meters and a building height of 15.67 meters;
The finished product processing and transfer workshop is a single-span single-layer steel frame workshop with a building area of 2,063 square meters and a building height of 25.65 meters;
The solid and hazardous waste temporary storage warehouse is a single-span single-layer steel frame workshop with a building area of 241.04 square meters and a building height of 10.8 meters.
![Harga Magnesium Naik Tiga Sesi Berturut-turut! Sisi Biaya Tetap "Membara" Sementara Sisi Permintaan Kesulitan Mengambil Alih [Komentar SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)


