SHANGHAI, Mar 3 (SMM) - Hydropower storage in Yunnan was merely 22 billion kwh at the end of 2022, which was far below the target and exacerbated the power shortfalls. This situation will not ease until the rainy season arrives.
SHANGHAI, Mar 3 (SMM) - Hydropower storage in Yunnan was merely 22 billion kwh at the end of 2022, which was far below the target and exacerbated the power shortfalls. This situation will not ease until the rainy season arrives.
Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.