Guangdong Enpack Packaging Co.,Ltd. said in a recent survey that the company invested 3.089 billion yuan in new energy vehicle power lithium battery composite copper foil and composite aluminium foil projects. The project is divided into two phases, and the construction period is about 3 years.
A total of 100 composite copper foil lines and 10 composite aluminium foil production lines will be constructed.
In 2023, the construction of 10 composite copper foil and 1 composite aluminium foil production lines will be built.
![[Mingyi Electronics Meluncurkan Peralatan Elektroplating Lini Gantry Rasio Aspek Tinggi untuk Server AI dan Substrat IC]](https://imgqn.smm.cn/usercenter/CaDcj20251217171711.jpg)
![Inflasi AS Melampaui Ekspektasi, Ditambah Penumpukan Inventaris di China, Harga Tembaga Rebound di Bawah Tekanan [Tinjauan Mingguan Makro SMM]](https://imgqn.smm.cn/usercenter/JnFuh20251217171711.jpg)

