New cooperation model? TSMC outsourced part of the CoWoS process to OSAT

Published: Nov 26, 2021 14:20

According to industry sources, TSMC has outsourced some of the processes of its CoWoS packaging business to OSAT, such as Sun and Moon, Silicon products and Anqu, especially in small batch customization products.

CoWoS (Chip On Wafer On Substrate) is a 2.5D packaging technology, which first connects the chip to the silicon wafer through the packaging process of Chip on Wafer (CoW), and then connects the CoW chip to the substrate (On Substrate, referred to as oS).

According to the Electronic Times, for some high-performance chips that require small batch production, TSMC only handles the CoW process at the wafer level, while a similar cooperation model for outsourcing the oS process to OSATs, is expected to continue in future 3D IC packages.

The basis of this model is that TSMC has highly automated wafer-level packaging technology, while there are relatively more parts of the oS process that cannot be automated and require more manpower, and OSAT has more experience in handling oS processes, which leads TSMC to outsource this part of the process.

In fact, in the past 2-3 years, TSMC has successively outsourced part of the oS process of packaging business to the above-mentioned enterprises, including silicon intermediate layer integrated or fan-out wafer-level packaging (FOWLP), and various HPC chips that need to be produced in small quantities using CoWoS or InFO_oS packaging processes.

Sources said that for TSMC, apart from advanced technology, the most profitable business is wafer-level SiP technology, such as CoW and WoW, followed by fan-out and intermediary layer integration, and oS has the lowest profit. Due to the significant increase in the demand for heterogeneous chip integration, TSMC is expected to adopt a more flexible model to cooperate with OSATs.

The person stressed that even if TSMC's latest SoIC technology is widely used in the future, the cooperation between foundry and OSATs will continue, because SoIC, like CoWoS, will eventually produce "wafer-shaped" chips that can integrate heterogeneous or homogeneous chips.

According to the source, TSMC also uses InFO_PoP technology without a substrate to encapsulate iPhone APs manufactured by advanced process nodes, and strong integrated manufacturing services help to secure a large number of orders from Apple.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Tungsten Analysis] May Recap: Europe Tungsten Stabilizes at Highs, China Shows Bottoming Signs
11 hours ago
[SMM Tungsten Analysis] May Recap: Europe Tungsten Stabilizes at Highs, China Shows Bottoming Signs
Read More
[SMM Tungsten Analysis] May Recap: Europe Tungsten Stabilizes at Highs, China Shows Bottoming Signs
[SMM Tungsten Analysis] May Recap: Europe Tungsten Stabilizes at Highs, China Shows Bottoming Signs
In May, European APT prices held firm above $3,000/mtu amid tight supply, while scrap tungsten dropped sharply. China's tungsten prices rebounded late in the month as sentiment improved, though downstream demand remained soft. A cautious bottoming trend emerged.
11 hours ago
Xinyu Longteng Fushun Tendered a Total of 184 mt of Ferromolybdenum on June 1
12 hours ago
Xinyu Longteng Fushun Tendered a Total of 184 mt of Ferromolybdenum on June 1
Read More
Xinyu Longteng Fushun Tendered a Total of 184 mt of Ferromolybdenum on June 1
Xinyu Longteng Fushun Tendered a Total of 184 mt of Ferromolybdenum on June 1
[Ferromolybdenum Tender Information] SMM reported on June 1: Xinyu Steel's tender plan on June 1: ferromolybdenum 60 mt, bid closing time: June 4, 2026, 14:20, delivery date: June 19, 2026. Longteng Special Steel's tender plan on June 1: ferromolybdenum 64 mt, bid closing time: June 2, 2026, 10:00, delivery date: June 20, 2026. Fushun's tender plan on June 1: ferromolybdenum 60 mt, delivery date: June 15, 2026.
12 hours ago
Tungsten Market Fluctuated Upward at the Beginning of the Week, with Active Trading and Rising Prices
16 hours ago
Tungsten Market Fluctuated Upward at the Beginning of the Week, with Active Trading and Rising Prices
Read More
Tungsten Market Fluctuated Upward at the Beginning of the Week, with Active Trading and Rising Prices
Tungsten Market Fluctuated Upward at the Beginning of the Week, with Active Trading and Rising Prices
[Tungsten News Flash] SMM June 1: At the start of the week, the tungsten market mainly fluctuated upward. Upstream suppliers were bullish with firm offers. Downstream powder and cemented carbide plants actively inquired for restocking, and market transactions were active. Mainstream downstream enterprises actively picked up goods under long-term contract supply. In addition, enterprises supplemented with spot order procurement, and overall procurement volume increased notably. SMM 65% wolframite concentrates closed at 434,500 yuan/standard tonne (65%WO3 basis) today, up 8,000 yuan/standard tonne (65%WO3 basis) WoW Friday, with some transactions based on premiums over the online price. SMM APT closed at 685,000 yuan/mt today, with smelters mostly adopting a wait-and-see approach and suspending offers.
16 hours ago
New cooperation model? TSMC outsourced part of the CoWoS process to OSAT - Shanghai Metals Market (SMM)