Operating rates of secondary lead smelters up 1.06 percentage points on week

Telah Terbit: Jul 23, 2021 16:44 (GMT+8)
Operating rates across licensed smelters of secondary lead in Jiangsu, Anhui, Henan and Guizhou averaged 61.47% in the week ended July 23, up 1.06 percentage points from the previous week, showed an SMM survey.

SHANGHAI, Jul 23 (SMM) – Operating rates across licensed smelters of secondary lead in Jiangsu, Anhui, Henan and Guizhou averaged 61.47% in the week ended July 23, up 1.06 percentage points from the previous week, showed an SMM survey.

In Anhui, Tianchang further resumed production this week after the maintenance, and Dadao suspended production for maintenance due to equipment failures. Henan Jinli halted production for one day amid power curtailment. The overall operating rate was recovering.

Besides the sample companies, Tongliao Taiding in Inner Mongolia resumed production early this week, Xincheng Power in Henan started maintenance in the mid-week due to equipment problems, Anhui Dadao finished maintenance, and Henan Jinli resumed normal production. Operating rates are expected to further rise next week.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | PhotonLink Coherent Menyiapkan Panggung untuk Peningkatan Komersial Indium Fosfida (InP)】
02 Oct 2026 14:34 (GMT+8)
【Flash | PhotonLink Coherent Menyiapkan Panggung untuk Peningkatan Komersial Indium Fosfida (InP)】
Baca Selengkapnya
【Flash | PhotonLink Coherent Menyiapkan Panggung untuk Peningkatan Komersial Indium Fosfida (InP)】
【Flash | PhotonLink Coherent Menyiapkan Panggung untuk Peningkatan Komersial Indium Fosfida (InP)】
Coherent meluncurkan PhotonLink, platform optik terintegrasi untuk infrastruktur AI yang menggabungkan laser Indium Phosphide (InP), fotonik silikon, detektor, dan modul optik. Perusahaan mengungkapkan lebih dari 10 keterlibatan CPO, lebih dari 10 keterlibatan NPO, dan lebih dari lima proyek konektivitas chip-ke-chip, dengan pelanggan utama dan perjanjian jangka panjang yang telah diamankan untuk CPO dan NPO. Pendapatan diperkirakan mulai meningkat pada Q4 2026. Coherent telah mengirimkan lebih dari 300 juta laser InP dan sedang memperluas kapasitas manufaktur InP 6 inci untuk mendukung peningkatan tersebut. Jalur pelanggan memberikan sinyal permintaan komersial yang lebih jelas untuk perangkat InP dan material hulu, meskipun kapasitas tambahan dan konsumsi indium tidak diungkapkan.
02 Oct 2026 14:34 (GMT+8)
Rig Kedua Nine Mile Tiba di Tribag–West Wedge untuk Menguji Tujuh Target Elektromagnetik
02 Oct 2026 10:38 (GMT+8)
Rig Kedua Nine Mile Tiba di Tribag–West Wedge untuk Menguji Tujuh Target Elektromagnetik
Baca Selengkapnya
Rig Kedua Nine Mile Tiba di Tribag–West Wedge untuk Menguji Tujuh Target Elektromagnetik
Rig Kedua Nine Mile Tiba di Tribag–West Wedge untuk Menguji Tujuh Target Elektromagnetik
Nine Mile Metals mengumumkan bahwa rig kedua mereka telah tiba di Tribag–West Wedge di New Brunswick, Kanada, dengan pengeboran diperkirakan akan dimulai di Tribag dalam beberapa hari mendatang. Tujuh target elektromagnetik yang dimodelkan terkait dengan keberadaan timbal-seng Tribag dan tembaga-timbal-seng West Wedge. Pengeboran Wedge terus berlanjut secara paralel. Hingga 21 September, perusahaan telah menyelesaikan 18 lubang dengan total 4.934,50 meter dari program tahunan 10.000 meter mereka. Konduktor tersebut tetap menjadi target geofisika yang memerlukan pengeboran untuk menentukan sumbernya.
02 Oct 2026 10:38 (GMT+8)
【SMM Berita Kilat】Masivo Menembus 32,50 Meter Mineralisasi Polimetalik Mengandung Timbal-Seng di Cerro Colorado.
01 Oct 2026 10:06 (GMT+8)
【SMM Berita Kilat】Masivo Menembus 32,50 Meter Mineralisasi Polimetalik Mengandung Timbal-Seng di Cerro Colorado.
Baca Selengkapnya
【SMM Berita Kilat】Masivo Menembus 32,50 Meter Mineralisasi Polimetalik Mengandung Timbal-Seng di Cerro Colorado.
【SMM Berita Kilat】Masivo Menembus 32,50 Meter Mineralisasi Polimetalik Mengandung Timbal-Seng di Cerro Colorado.
Masivo Silver melaporkan hasil uji dari CC-26-001, lubang bor pertamanya di Cerro Colorado, Sonora, Meksiko. Lubang tersebut memotong 32,50 meter dari kedalaman 226,30 hingga 258,80 meter dengan kadar rata-rata 0,271% seng, 0,141% timbal, dan 7,0 g/t perak. Kendala teknis menghentikan pengeboran pada kedalaman 259,5 meter sementara lubang masih berada di dalam batuan termineralisasi.
01 Oct 2026 10:06 (GMT+8)