Exclusive: China copper cathode output rose 4.71% MoM to 860,500 mt in March

Telah Terbit: Apr 9, 2021 10:28
An SMM survey showed that China produced 860,500 mt of copper cathode in March, rising 4.71% from February and 15.71% from a year ago, as some copper smelters recovered from maintenance and due to more operating days in the month.

SHANGHAI, Apr 9 (SMM)—An SMM survey showed that China produced 860,500 mt of copper cathode in March, rising 4.71% from February and 15.71% from a year ago, as some copper smelters recovered from maintenance and due to more operating days in the month.

Rising refining charges (RCs) for blister copper and fast-increasing sulphuric acid prices in east and south China prompted copper smelters to maintain high operating rates. In addition, as copper prices have steadied and consumption has improved amid a high season, finished product inventory pressure eased across smelters.  

According to smelters’ production schedules, SMM expects China’s copper cathode output to shrink 1.63% on the month, but to rise 12.51% on the year to 846,500 mt in April. For the first four months of 2021, output is likely to total 3.33 million mt, up 14.54% from the same period last year.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Harga tembaga yang tinggi menekan pembelian di hilir, dengan tingkat operasi dan pesanan baru terus menurun
1 jam yang lalu
Harga tembaga yang tinggi menekan pembelian di hilir, dengan tingkat operasi dan pesanan baru terus menurun
Baca Selengkapnya
Harga tembaga yang tinggi menekan pembelian di hilir, dengan tingkat operasi dan pesanan baru terus menurun
Harga tembaga yang tinggi menekan pembelian di hilir, dengan tingkat operasi dan pesanan baru terus menurun
Harga tembaga yang tinggi dan permintaan yang lemah memberikan tekanan ganda, membuat industri kawat email tetap dalam tren lesu. Minggu ini, tingkat operasional mesin industri kawat email turun 2,47 poin persentase dibandingkan minggu sebelumnya, dan penerimaan pesanan baru turun 1,14 poin persentase dibandingkan minggu sebelumnya.
1 jam yang lalu
Harga tembaga yang tinggi menekan pembelian di hilir; tingkat operasi dan pesanan baru terus menurun [Tinjauan Mingguan Pasar Kawat Email SMM]
1 jam yang lalu
Harga tembaga yang tinggi menekan pembelian di hilir; tingkat operasi dan pesanan baru terus menurun [Tinjauan Mingguan Pasar Kawat Email SMM]
Baca Selengkapnya
Harga tembaga yang tinggi menekan pembelian di hilir; tingkat operasi dan pesanan baru terus menurun [Tinjauan Mingguan Pasar Kawat Email SMM]
Harga tembaga yang tinggi menekan pembelian di hilir; tingkat operasi dan pesanan baru terus menurun [Tinjauan Mingguan Pasar Kawat Email SMM]
Tingkat operasi mesin industri kawat email turun dari minggu ke minggu pada minggu ini (21 Agustus–27 Agustus) ....
1 jam yang lalu
Capstone menyelesaikan akuisisi San Pietro, mengonsolidasikan distrik tembaga Atacama
1 jam yang lalu
Capstone menyelesaikan akuisisi San Pietro, mengonsolidasikan distrik tembaga Atacama
Baca Selengkapnya
Capstone menyelesaikan akuisisi San Pietro, mengonsolidasikan distrik tembaga Atacama
Capstone menyelesaikan akuisisi San Pietro, mengonsolidasikan distrik tembaga Atacama
Capstone Copper menyelesaikan akuisisi proyek tembaga-emas-besi-kobalt San Pietro di wilayah Atacama, Chili, pada 31 Agustus 2026, dengan membayar US$25 juta dalam bentuk saham Capstone kepada New Golden Exploration Chile, perusahaan patungan Golden Arrow dan SSA. Terletak di antara properti Mantoverde, Santo Domingo, dan Sierra Norte miliknya, San Pietro menambah sekitar 16.000 hektare lahan yang sangat prospektif. Endapan Rincones dan Colla memiliki sumber daya tereka sebesar 492 juta ton dengan kadar 0,23% tembaga dan 0,05 g/t emas. Dalam radius 20 km, konsesi Capstone kini mencakup sekitar 1,6 miliar ton sumber daya terukur dan terindikasi serta 1,4 miliar ton sumber daya tereka. Setelah pembelian Sierra Norte pada 2024 dan opsi ENAMI pada 2025, kesepakatan ini mengonsolidasikan infrastruktur distrik dan memperluas opsi pertumbuhan tembaga di masa depan.
1 jam yang lalu