[SMM analysis] the price difference between refined and waste copper and the supply of scrap copper improved, and the scrap copper rod increased the consumption of refined copper.

Telah Terbit: May 14, 2020 20:16 (GMT+8)

SMM5, 14 March:

According to SMM research data, the operating rate of scrap copper rod enterprises in April was 28.16%, an increase of 9.62 percentage points over the previous month and a decrease of 38.82 percentage points from the same period last year.

The resumption of production in the scrap copper rod industry has been further improved, but it is only operating at a very low operating rate compared with the same period last year. In April, the supply of scrap copper was still very tight, leading to the need for manufacturers to increase prices. Due to high costs and the inability to ensure a stable supply of raw materials, some of the scrap copper rod industry failed to restart or run only one production line. In addition, the price difference between scrap copper rod and refined copper rod is maintained in a very small range, lack of price advantage, downstream favored the purchase of refined copper rod, scrap copper rod order is not good also to curb the enthusiasm of enterprises to start.

According to the SMM survey, the operating rate of scrap copper rod enterprises is expected to be 35.53% in May, an increase of 7.37 percentage points over the previous month and a decrease of 18.91 percentage points from the same period last year.

With the continuous recovery of copper prices and the repair of fine waste price differentials, the production profits of enterprises and the advantages of scrap copper rods gradually expanded; and at the end of April, scrap copper traders actively profited from shipping or stop-loss exchange in the high copper price range, and the supply of scrap copper improved significantly. The expansion of the price difference between fine and waste is accompanied by the decrease of the difficulty of replenishing raw materials, and the amount of scrap copper rod flowing to the market has also increased obviously. At present, the price difference between scrap copper rods and refined copper is maintained at 400-500 yuan / ton, which will undoubtedly continue to be good for scrap copper rods. However, due to the tight supply of scrap copper as a whole, the operating rate of scrap copper rods is expected to rise only slightly in May. There is still a lot of distance from the same period last year.

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
1 jam yang lalu
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
Baca Selengkapnya
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
Kobrea Exploration Corp. mengumumkan persetujuan program eksplorasi 2026/27 senilai US$4 juta untuk Distrik Pertambangan Malargüe Barat di Provinsi Mendoza, Argentina, yang sepenuhnya didanai oleh BHP. Program ini mencakup pengeboran inti di target porfiri tembaga-emas-molibdenum El Destino, survei polarisasi terinduksi di El Destino dan KBX-17, serta pemetaan geologi, pengambilan sampel geokimia, dan pekerjaan hiperspektral. Aliansi eksplorasi ini mencakup tujuh proyek dengan total luas sekitar 733 kilometer persegi, tempat anomali geokimia tembaga, emas, dan molibdenum telah teridentifikasi. Analisis SMM: persetujuan anggaran baru mengubah kemitraan BHP-Kobrea dari kerangka aliansi menjadi fase pengeboran aktif. Namun, properti tersebut masih berada pada tahap eksplorasi awal, tanpa molibden
1 jam yang lalu
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
1 jam yang lalu
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
Baca Selengkapnya
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
Glencore berencana menyerahkan laporan dampak lingkungan untuk proyek tembaga-molibdenum El Pachón di Argentina pada kuartal I 2027 dan menargetkan persetujuan di bawah Rezim Insentif untuk Investasi Besar, atau RIGI, sebelum Juli 2027. Glencore sebelumnya melaporkan sekitar 6 miliar ton sumber daya mineral dengan kadar rata-rata 0,43% tembaga, 2,2 g/t perak, dan 130 g/t molibdenum, setara dengan sekitar 0,013% Mo. Berdasarkan tonase dan kadar rata-rata yang diungkapkan, sumber daya tersebut mengandung sekitar 780.000 ton molibdenum in-situ, meskipun ini tidak mewakili cadangan, logam yang dapat diperoleh kembali, atau produksi di masa depan. Selama musim eksplorasi 2025/26, proyek ini menyelesaikan 53 lubang bor dengan total 21.246 meter dan memajukan infrastruktur awal jalan dan jembatan.
1 jam yang lalu
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
1 jam yang lalu
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
Baca Selengkapnya
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
Glencore mengumumkan bahwa proyek Agua Rica, yang dikenal sebagai MARA, telah menerima persetujuan di bawah Rezim Insentif untuk Investasi Besar Argentina, atau RIGI. Deposit tembaga-emas-perak-molibdenum skala besar ini mengandung sekitar 1,2 miliar ton sumber daya mineral terukur dan terindikasi dengan kadar rata-rata 0,03% molibdenum. Berdasarkan tonase dan kadar yang diungkapkan, sumber daya tersebut mengandung sekitar 360.000 ton molibdenum in-situ; namun, ini tidak mewakili cadangan, logam yang dapat dipulihkan, atau produksi molibdenum di masa depan. Glencore juga memajukan perkiraan produksi pertama dari restart Alumbrera menjadi H2 2027 dari sebelumnya H1 2028. Infrastruktur pemrosesan, logistik, dan tenaga kerja Alumbrera diharapkan dapat mendukung pengembangan MARA di masa depan. Analisis SMM: Persetujuan RIGI meningkatkan kepastian fiskal dan regulasi proyek, tetapi belum ada keputusan investasi final, rencana pemulihan molibdenum, atau panduan produksi molibdenum yang diumumkan, sehingga tidak ada dampak langsung dalam jangka pendek terhadap pasokan molibdenum.
1 jam yang lalu