SMM Morning Comments (Jul 4)

Telah Terbit: Jul 4, 2019 10:00
SMM Morning Comments

SHANGHAI, Jul 4 (SMM) – 

Copper: Disappointing US employment data drove investors to cover their shorts and this rallied copper prices. Both three-month LME copper and the most-traded SHFE August contract grew more than 0.5%, with open interests across all SHFE copper contracts down some 7,000 lots as shorts exited. However, limited changes in fundamentals and concerns about a global economic slowdown will continue to pressure prices in the short run. LME copper inventories surged over 30,000 mt on Wednesday. Today, LME copper is seen trading at $5,890-5,950/mt, with its SHFE counterpart at 46,300-46,700 yuan/mt. Downstream purchases will keep spot premiums firm at 60-140 yuan/mt. 

Aluminium: As the US dollar weakened, three-month LME aluminium climbed along with the five-day moving average, to a high of $1,793/mt, ending up 0.53% at $1,789/mt. The most-liquid SHFE August contract also closed 0.66% higher at 13,740 yuan/mt, after it climbed to the highest overnight at 13,745 yuan/mt. Trading range today is seen at 13,650-13,800 yuan/mt, with LME aluminium at $1,770-1,800/mt. 

Zinc: Lower LME zinc inventories buoyed three-month LME zinc to the 10-day moving average, around $2,480/mt, but eased backwardation depressed its upward momentum, ending it 0.81% lower on the day at $2,448/mt. The most-active SHFE August contract retreated after jumped to highs of 19,740 yuan/mt, driven by expectations of upcoming maintenance across northern smelters. The contract gained 0.2% and finished at 19,690 yuan/mt. Today, it is expected to trade between 19,500-20,000 yuan/mt, with LME zinc at $2,430-2,480/mt. 

Nickel: A weaker greenback and lower nickel stocks across LME-approved warehouses boosted three-month LME nickel to a high of $12,385/mt, before it closed at $12,370/mt, up 2.15% on the day. With pressure above from the five- and 10-day moving averages, it may manage to stand firm above the 60-day moving average today. The most-traded SHFE August contract found support from the 98,000 yuan/mt level after it slipped below the daily moving average, ending higher at 98,440 yuan/mt. Today, it will continue to test support from 98,000 yuan/mt and hover around the five-day moving average. 

Lead: Three-month LME lead fell for the third consecutive trading day as it slid 0.48% overnight to end at $1,879.5/mt after jumped to a high of $1,900.5/mt. The most-active SHFE August contract rebounded from a low of 15,925 yuan/mt, and closed 0.19% higher at 16,045 yuan/mt. Shorts departing at lows will provide some support to the contract in the short term.  

Tin: Three-month LME tin regained nearly half of the losses from the previous session as it rebounded to a high of $18,300/mt and closed 2.97% higher at $18,200/mt. With support from $17,600/mt, it is likely to test resistance from $18,300/mt today. The most-liquid SHFE September contract also rallied, on lower US dollar and higher oil prices, to a high of 135,330 yuan/mt, but remained below all the moving averages, ending up 2.29% at 134,100 yuan/mt. Pressure above is seen from the five-day moving average, or the 135,900 yuan/mt level. 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
12 Sep 2026 16:51
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Baca Selengkapnya
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Pada 12 September pukul 9:58, tungku peleburan inti sistem pirometalurgi di proyek pemulihan multi-logam Yingkou Jianfa Shenghai Nonferrous Metals & Chemicals Co., Ltd. berhasil dinyalakan, secara resmi memasuki tahap pengeringan tungku dan menandai langkah kunci menuju commissioning dan produksi seluruh lini. Informasi publik menunjukkan bahwa proyek peningkatan teknologi pemulihan komprehensif bijih emas-perak polimetalik kompleks, relokasi, dan perluasan Yingkou Jianfa Shenghai menggunakan konsentrat tembaga sebagai bahan baku utama, dengan kapasitas terencana keseluruhan 600.000 ton/tahun katoda tembaga yang akan dibangun dalam dua fase, dengan kapasitas 300.000 ton/tahun per fase. Fase I dirancang untuk memproduksi 300.000 ton/tahun katoda tembaga dan 1,18 juta ton/tahun asam sulfat, beserta sistem pendukung untuk peleburan, konversi, pemurnian anoda, elektrolisis, benefisiasi terak, dan pemulihan logam mulia. Setelah penyalaan ini, proyek akan melaksanakan pengeringan tungku terstandarisasi dan uji coba terpadu kondisi panas di seluruh sistem untuk memverifikasi peralatan, instrumen, interlock, dan sistem kontrol otomatis. Proyek ini belum secara resmi memulai pengumpanan bahan baku dan produksi; setelah pengeringan tungku dan commissioning sistem selesai, akan dilanjutkan dengan commissioning kapasitas katoda tembaga 300.000 ton/tahun Fase I. Jika proyek berhasil mulai berproduksi, diharapkan dapat meningkatkan kapasitas peleburan tembaga di Tiongkok Utara dan semakin mendorong permintaan domestik akan bahan baku konsentrat tembaga.
12 Sep 2026 16:51
Logam Mulia Tetap Bergerak dalam Kisaran saat Makro Memasuki Jendela Validasi Kunci [Analisis Makro Logam Mulia SMM]
11 Sep 2026 17:43
Logam Mulia Tetap Bergerak dalam Kisaran saat Makro Memasuki Jendela Validasi Kunci [Analisis Makro Logam Mulia SMM]
Baca Selengkapnya
Logam Mulia Tetap Bergerak dalam Kisaran saat Makro Memasuki Jendela Validasi Kunci [Analisis Makro Logam Mulia SMM]
Logam Mulia Tetap Bergerak dalam Kisaran saat Makro Memasuki Jendela Validasi Kunci [Analisis Makro Logam Mulia SMM]
11 Sep 2026 17:43
Amigo Resources Melaporkan Nilai PGM hingga 7,07 ppm dalam Uji Pengolahan di Tanzania
11 Sep 2026 16:30
Amigo Resources Melaporkan Nilai PGM hingga 7,07 ppm dalam Uji Pengolahan di Tanzania
Baca Selengkapnya
Amigo Resources Melaporkan Nilai PGM hingga 7,07 ppm dalam Uji Pengolahan di Tanzania
Amigo Resources Melaporkan Nilai PGM hingga 7,07 ppm dalam Uji Pengolahan di Tanzania
[SMM Flash] Amigo Resources melaporkan hasil laboratorium independen dari material terpilih asal Tanzania yang menunjukkan nilai gabungan PGM sebesar 6,94–7,07 ppm, bersama dengan nilai emas residu sebesar 3,27–3,47 ppm. Perusahaan menyatakan sedang mengkaji integrasi teknologi konsentrasi PGM miliknya ke dalam diagram alir pemrosesan untuk menargetkan perolehan dari tailing gravitasi dan material residu lainnya. Amigo juga sedang mengevaluasi rute perlakuan pirometalurgi copper-matte dan telah mengerahkan tungku skala kecil untuk pengujian lebih lanjut. Program ini berpotensi menetapkan PGM sebagai produk sampingan yang dapat diperoleh kembali dari material polimetalik Tanzania milik Amigo jika pekerjaan metalurgi selanjutnya menunjukkan perolehan yang layak. Namun, kadar yang dilaporkan berkaitan dengan material uji terpilih dan studi pemrosesan, serta bukan merupakan Sumber Daya Mineral, cadangan, atau bukti produksi PGM skala komersial yang sesuai standar. Oleh karena itu, pengujian metalurgi lebih lanjut akan menjadi penting untuk menentukan apakah kandungan PGM yang dilaporkan dapat diubah menjadi aliran produk yang dapat diperoleh kembali secara ekonomis.
11 Sep 2026 16:30