SMM Morning Comments (Mar 8)

Telah Terbit: Mar 8, 2019 09:58
SMM Morning Comments

SHANGHAI, Mar 8 (SMM) – 

Copper: LME copper failed to stand firm at highs after it rose to the highest overnight at $6,450.5/mt, as the US dollar strengthened and shorts entered. It ended at $6,435/mt, with open interests up 1,018 lots to 298,000 lots. The SHFE 1905 contract unsuccessfully tested pressure from the daily moving average for several times, before it dropped to a low of 49,020 yuan/mt. It lost support from the 20-day moving average and closed at 49,160 yuan/mt. Today, we see it trading at 49,000-49,500 yuan/mt, with LME copper at $6,400-6,450/mt. Spot sellers are likely to expand discounts to 140 yuan/mt as a wider backwardation in copper futures deters purchases. 

Aluminium: LME aluminium rebounded after it dipped to a low of $1,857/mt, but a robust US dollar limited its upward momentum and ended it at $1,863/mt. As shorts exited, the SHFE 1905 contract inched up overnight, with the K-line testing pressure at the 20-day moving average. The contract is likely to trade at 13,400-13,600 yuan/mt, with LME aluminium at $1,840-1,890/mt today. Spot discounts are set at 50-10 yuan/mt. 

Zinc: A stronger US dollar dragged LME zinc below the five- and 10-day moving averages last night. It failed to find support at $2,750/mt, and closed 1.78% lower on the day at $2,735/mt. LME zinc inventories expanded but remained at record lows in over 10 years. The SHFE 1905 contract fell below the 20-day moving average, pressured by domestic high stocks and tepid demand. As investors remain cautious, the contract may trade at 21,150-21,650 yuan/mt today, with LME zinc at $2,720-2,770/mt. 

Nickel: A stronger US dollar and news of a domestic expansion of nickel pig iron (NPI) capacity lowered LME nickel by 3.04% and the SHFE 1905 contract by 2.49%, despite the current shortage of NPI in domestic markets. Slow trades of stainless steel this week also depressed nickel prices. Today, we expect the 1905 contract to trade weakly at 102,000-103,000 yuan/mt, with spot prices at 104,200-105,300 yuan/mt. 

Lead: LME lead consolidated around the daily moving average for the third consecutive trading day, as it closed higher overnight at $2,103.5/mt. We expect it to fall below current support if the US dollar continues to climb. The SHFE 1904 contract rallied to the daily moving average after it slid to a low of 17,395 yuan/mt. It is likely to face continued pressure today as the five-day moving average traded at lower levels.

Tin: Pressure from the five- and 10-day moving averages above, and rising shorts weighed LME tin to a low of $21,365/mt during the European trading session, and ended it at $21,485/mt. It will trade with support at $21,300/mt today. The SHFE 1905 contract tested support at the 60-day moving average as it declined to a low of 147,620 yuan/mt. We expect it to continue to test support below at 147,500 yuan/mt today. 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
12 Sep 2026 16:51
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Baca Selengkapnya
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Proyek Katoda Tembaga 300.000 mt Yingkou Jianfa Shenghai Tahap I Tungku Peleburan Mulai Berproduksi, Sistem Pirometalurgi Memasuki Tahap Pengeringan Tungku
Pada 12 September pukul 09.58, tungku peleburan inti sistem pirometalurgi proyek pemulihan polimetalik di Yingkou Jianfa Shenghai Nonferrous Chemical Co., Ltd. berhasil dinyalakan, secara resmi memasuki tahap pengeringan tungku dan menandai langkah kunci menuju commissioning dan produksi seluruh lini. Informasi publik menunjukkan bahwa proyek peningkatan teknologi pemulihan komprehensif bijih emas-perak kompleks polimetalik, relokasi, dan perluasan Yingkou Jianfa Shenghai menggunakan konsentrat tembaga sebagai bahan baku utama, dengan kapasitas terencana keseluruhan 600.000 ton/tahun katoda tembaga. Proyek ini dibangun dalam dua fase, dengan kapasitas 300.000 ton/tahun di setiap fase. Fase satu dirancang untuk memproduksi 300.000 ton/tahun katoda tembaga dan 1,18 juta ton/tahun asam sulfat, didukung oleh sistem peleburan, konversi, pemurnian anoda, elektrolisis, benefisiasi terak, dan pemulihan logam mulia. Setelah penyalaan, proyek akan melaksanakan pengeringan tungku terstandarisasi dan commissioning terpadu kondisi panas di seluruh sistem, memverifikasi peralatan, instrumentasi, interlock, dan sistem kontrol otomatis. Proyek belum secara resmi memulai pengumpanan bahan baku dan produksi. Setelah pengeringan tungku dan commissioning sistem selesai, proyek akan melanjutkan dengan membawa kapasitas katoda tembaga fase satu sebesar 300.000 ton/tahun ke tahap produksi. Jika proyek berhasil di-commissioning, hal ini akan meningkatkan kapasitas peleburan tembaga di Tiongkok timur laut dan semakin mendorong permintaan Tiongkok akan bahan baku konsentrat tembaga.
12 Sep 2026 16:51
Logam Mulia Tetap Bergerak dalam Kisaran saat Makro Memasuki Jendela Validasi Kunci [Analisis Makro Logam Mulia SMM]
11 Sep 2026 17:43
Logam Mulia Tetap Bergerak dalam Kisaran saat Makro Memasuki Jendela Validasi Kunci [Analisis Makro Logam Mulia SMM]
Baca Selengkapnya
Logam Mulia Tetap Bergerak dalam Kisaran saat Makro Memasuki Jendela Validasi Kunci [Analisis Makro Logam Mulia SMM]
Logam Mulia Tetap Bergerak dalam Kisaran saat Makro Memasuki Jendela Validasi Kunci [Analisis Makro Logam Mulia SMM]
11 Sep 2026 17:43
Amigo Resources Melaporkan Nilai PGM hingga 7,07 ppm dalam Uji Pengolahan di Tanzania
11 Sep 2026 16:30
Amigo Resources Melaporkan Nilai PGM hingga 7,07 ppm dalam Uji Pengolahan di Tanzania
Baca Selengkapnya
Amigo Resources Melaporkan Nilai PGM hingga 7,07 ppm dalam Uji Pengolahan di Tanzania
Amigo Resources Melaporkan Nilai PGM hingga 7,07 ppm dalam Uji Pengolahan di Tanzania
[SMM Flash] Amigo Resources melaporkan hasil laboratorium independen dari material terpilih asal Tanzania yang menunjukkan nilai gabungan PGM sebesar 6,94–7,07 ppm, bersama dengan nilai emas residu sebesar 3,27–3,47 ppm. Perusahaan menyatakan sedang mengkaji integrasi teknologi konsentrasi PGM miliknya ke dalam diagram alir pemrosesan untuk menargetkan perolehan dari tailing gravitasi dan material residu lainnya. Amigo juga sedang mengevaluasi rute perlakuan pirometalurgi copper-matte dan telah mengerahkan tungku skala kecil untuk pengujian lebih lanjut. Program ini berpotensi menetapkan PGM sebagai produk sampingan yang dapat diperoleh kembali dari material polimetalik Tanzania milik Amigo jika pekerjaan metalurgi selanjutnya menunjukkan perolehan yang layak. Namun, kadar yang dilaporkan berkaitan dengan material uji terpilih dan studi pemrosesan, serta bukan merupakan Sumber Daya Mineral, cadangan, atau bukti produksi PGM skala komersial yang sesuai standar. Oleh karena itu, pengujian metalurgi lebih lanjut akan menjadi penting untuk menentukan apakah kandungan PGM yang dilaporkan dapat diubah menjadi aliran produk yang dapat diperoleh kembali secara ekonomis.
11 Sep 2026 16:30
SMM Morning Comments (Mar 8) - Shanghai Metals Market (SMM)