Songhe Recycling Resources’ lead recycling project in Xinhe county begins construction

Telah Terbit: Feb 25, 2019 10:22 (GMT+8)
The project can treat 300,000 mt of retired batteries and lead-containing waste per year

SHANGHAI, Feb 25 (SMM) – The construction of Songhe Recycling Resources’ lead recycling project in Xinhe county of Hebei province began on Saturday February 23, SMM learned.

The project, operated by Xingtai Songhe Environmental Technology, a subsidiary of the Hebei-based Songhe Recycling Resources, can treat 300,000 mt of retired batteries and lead-containing waste per year.

After commissining, the project will produce 200,000 mt of secondary lead and lead alloy and 45,000 mt of plastic raw materials per year. This would be the largest firm in the treatment of lead-bearing waste in China.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn