Maintenance lowers operating rates across primary lead smelters

Telah Terbit: Jan 25, 2019 16:49
Rates lost 3 percentage points from the previous week and averaged 52.6% in the week through Jan 25

SHANGHAI, Jan 25 (SMM) – Operating rates across primary lead smelters in Henan, Hunan and Yunnan provinces declined 3 percentage points from the previous week and averaged 52.6% in the week through January 25, SMM data showed.

Rates across plants in Henan fell 2.4 percentage points to 74.6% as Qinling Smelting started maintenance. The smelter continued to produce a small amount of primary lead this week as the maintenance was conducted on crude lead processes. Maintenance is likely to continue after Chinese New Year.

Some smelters in Hunan also began maintenance this week and this lowered the operating rates across the region by 1.5 percentage points.

Rates across plants in Yunnan slumped 5.9 percentage points this week. Yunnan Zhenxing began maintenance this week, which is likely to last after the CNY and affect output by 1,000-1,500 mt.

The Yunnan-based Chihong Zinc & Germanium also began maintenance this week, but the current maintenance was conducted on the crude lead stage. Production of primary lead is likely to be affected in February.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Silver Bow Mining Mengakuisisi Kompleks Metalurgi Montana dengan Dua Sirkuit Pemrosesan
4 jam yang lalu
Silver Bow Mining Mengakuisisi Kompleks Metalurgi Montana dengan Dua Sirkuit Pemrosesan
Baca Selengkapnya
Silver Bow Mining Mengakuisisi Kompleks Metalurgi Montana dengan Dua Sirkuit Pemrosesan
Silver Bow Mining Mengakuisisi Kompleks Metalurgi Montana dengan Dua Sirkuit Pemrosesan
Pada tanggal 24 Agustus, Silver Bow Mining Corp. mengumumkan bahwa mereka telah menandatangani perjanjian pembelian aset definitif dengan Montana Goldfields, Inc. dan Montana Tunnels Mining, Inc. untuk mengakuisisi kompleks metalurgi terpadu di Jefferson County, Montana. Kompleks ini mencakup dua sirkuit pengolahan mineral terpisah, serta tambang bersejarah Montana Tunnels M-Pit. Kompleks Metalurgi Jefferson County mencakup sirkuit pengolahan dengan kapasitas 15.000 ton per hari dan 1.000 ton per hari, beserta fasilitas penghancuran dan penyimpanan bijih, fasilitas tailing, dan infrastruktur terkait. Sirkuit 1.000 ton per hari diperkirakan cocok untuk mengolah mineralisasi perak-emas-seng-timbal kadar tinggi dari sumber daya Rainbow Block milik Silver Bow Mining.
4 jam yang lalu
Pasokan mendapat dukungan, permintaan tertekan, timbal SHFE ditutup dengan lilin bearish bayangan bawah panjang [Tinjauan Singkat Futures Timbal]
6 jam yang lalu
Pasokan mendapat dukungan, permintaan tertekan, timbal SHFE ditutup dengan lilin bearish bayangan bawah panjang [Tinjauan Singkat Futures Timbal]
Baca Selengkapnya
Pasokan mendapat dukungan, permintaan tertekan, timbal SHFE ditutup dengan lilin bearish bayangan bawah panjang [Tinjauan Singkat Futures Timbal]
Pasokan mendapat dukungan, permintaan tertekan, timbal SHFE ditutup dengan lilin bearish bayangan bawah panjang [Tinjauan Singkat Futures Timbal]
6 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (25 Agustus)
6 jam yang lalu
Data: Pergerakan pasar SHFE, DCE (25 Agustus)
Baca Selengkapnya
Data: Pergerakan pasar SHFE, DCE (25 Agustus)
Data: Pergerakan pasar SHFE, DCE (25 Agustus)
Tabel berikut menunjukkan pergerakan logam besi dan non-besi di SHFE dan DCE pada 25 Agustus 2026.
6 jam yang lalu
Maintenance lowers operating rates across primary lead smelters - Shanghai Metals Market (SMM)