SMM Morning Comments (Aug 7)

Telah Terbit: Aug 07, 2018 09:50 (GMT+8)
SMM Morning Comments

SHANGHAI, Aug 7 (SMM) –

Copper: LME copper fell to a low of $6,064/mt, and closed at $6,105/mt on Monday. The SHFE 1809 contract opened lower but recovered some losses later, closing at 49,330 yuan/mt. Shorts are likely to drag LME copper down to the $6,000/mt level with escalating US-China trade wars. We expect LME copper to trade at $6,070-6,130/mt today with the SHFE 1809 contract at 49,000-49,500 yuan/mt. Spot premiums are likely to sustain at 70-100 yuan/mt today.

Aluminium: As investors added their long bets, the most-traded aluminium contract on the SHFE rose to a high of 14,485 yuan/mt and closed at 14,475 yuan/mt overnight. Its strong performance bolstered LME aluminium, which rebounded and closed at $2,053/mt on Monday. We see upward momentum for SHFE aluminium in anticipation of winter production cuts and rising prebaked anode prices. Besides, inventory across China continued to decrease and consumption remained solid. We expect the SHFE 1810 contract to trade at 14,400-14,550 yuan/mt with LME aluminium at $2,040-2,060/mt today. Spot discounts are seen at 70-30 yuan/mt.

Zinc: LME zinc clawed back some early losses but traded under pressure at the middle Bollinger band on Monday. We see limited upward room for it and expect it to consolidate at $2,560-2,610/mt today. The SHFE 1810 contract opened lower but climbed overnight as shorts cut their positions. We expect the contract to consolidate at 21,300-21,800 yuan/mt today.

Nickel: LME nickel reversed early losses, hitting a high of $13,725/mt and closing at $13,700/mt last night. The SHFE 1809 contract jumped past the 40-day moving average to a high of 112,780 yuan/mt and closed at 112,480 yuan/mt overnight. The shrinking LME and SHFE inventory gave some support to nickel prices. We expect LME nickel to hover around $13,600/mt today with the SHFE 1809 contract at 110,000-112,000 yuan/mt. Spot prices are seen at 111,000-113,000 yuan/mt.

Lead: LME lead fell to a year’s low of $2,074/mt during the European trading session as lead inventory increased 450 mt. With support at $2,100/mt, it then went back up and to close at $2,115.5/mt. Support at the $2,100/mt level is expected to stay in the short term. The SHFE 1809 contract also rebounded after tumbling to a one-year low at 17,750 yuan/mt. We expect it to consolidate around 18,000 yuan/mt today.

Tin: A strengthened US dollar dragged LME tin to a low of $19,480/mt overnight. With support at $19,200/mt, it is expected to continue its weak trend in the short run. The SHFE 1809 contract traded more strongly than its LME counterpart, and gained 450 yuan/mt from last Friday to close at 146,460 yuan/mt on Monday. Resistance is seen at 147,000 yuan/mt with support at 145,000 yuan/mt today.

 

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
2 jam yang lalu
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
Baca Selengkapnya
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
【Flash | Program yang Didanai BHP Memajukan Pengeboran di Target Tembaga-Emas-Molibdenum El Destino, Argentina】
Kobrea Exploration Corp. mengumumkan persetujuan program eksplorasi 2026/27 senilai US$4 juta untuk Distrik Pertambangan Malargüe Barat di Provinsi Mendoza, Argentina, yang sepenuhnya didanai oleh BHP. Program ini mencakup pengeboran inti di target porfiri tembaga-emas-molibdenum El Destino, survei polarisasi terinduksi di El Destino dan KBX-17, serta pemetaan geologi, pengambilan sampel geokimia, dan pekerjaan hiperspektral. Aliansi eksplorasi ini mencakup tujuh proyek dengan total luas sekitar 733 kilometer persegi, tempat anomali geokimia tembaga, emas, dan molibdenum telah teridentifikasi. Analisis SMM: persetujuan anggaran baru mengubah kemitraan BHP-Kobrea dari kerangka aliansi menjadi fase pengeboran aktif. Namun, properti tersebut masih berada pada tahap eksplorasi awal, tanpa molibden
2 jam yang lalu
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
2 jam yang lalu
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
Baca Selengkapnya
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
【Kilas | Glencore Targetkan Pengajuan Lingkungan Kuartal I 2027 untuk Proyek Tembaga-Molibdenum El Pachón】
Glencore berencana menyerahkan laporan dampak lingkungan untuk proyek tembaga-molibdenum El Pachón di Argentina pada kuartal I 2027 dan menargetkan persetujuan di bawah Rezim Insentif untuk Investasi Besar, atau RIGI, sebelum Juli 2027. Glencore sebelumnya melaporkan sekitar 6 miliar ton sumber daya mineral dengan kadar rata-rata 0,43% tembaga, 2,2 g/t perak, dan 130 g/t molibdenum, setara dengan sekitar 0,013% Mo. Berdasarkan tonase dan kadar rata-rata yang diungkapkan, sumber daya tersebut mengandung sekitar 780.000 ton molibdenum in-situ, meskipun ini tidak mewakili cadangan, logam yang dapat diperoleh kembali, atau produksi di masa depan. Selama musim eksplorasi 2025/26, proyek ini menyelesaikan 53 lubang bor dengan total 21.246 meter dan memajukan infrastruktur awal jalan dan jembatan.
2 jam yang lalu
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
2 jam yang lalu
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
Baca Selengkapnya
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
【Flash | Glencore Raih Persetujuan RIGI untuk Proyek Tembaga-Emas-Perak-Molibdenum Agua Rica di Argentina】
Glencore mengumumkan bahwa proyek Agua Rica, yang dikenal sebagai MARA, telah menerima persetujuan di bawah Rezim Insentif untuk Investasi Besar Argentina, atau RIGI. Deposit tembaga-emas-perak-molibdenum skala besar ini mengandung sekitar 1,2 miliar ton sumber daya mineral terukur dan terindikasi dengan kadar rata-rata 0,03% molibdenum. Berdasarkan tonase dan kadar yang diungkapkan, sumber daya tersebut mengandung sekitar 360.000 ton molibdenum in-situ; namun, ini tidak mewakili cadangan, logam yang dapat dipulihkan, atau produksi molibdenum di masa depan. Glencore juga memajukan perkiraan produksi pertama dari restart Alumbrera menjadi H2 2027 dari sebelumnya H1 2028. Infrastruktur pemrosesan, logistik, dan tenaga kerja Alumbrera diharapkan dapat mendukung pengembangan MARA di masa depan. Analisis SMM: Persetujuan RIGI meningkatkan kepastian fiskal dan regulasi proyek, tetapi belum ada keputusan investasi final, rencana pemulihan molibdenum, atau panduan produksi molibdenum yang diumumkan, sehingga tidak ada dampak langsung dalam jangka pendek terhadap pasokan molibdenum.
2 jam yang lalu