LME Net Long Lead Positions Grow after Falling for 3 Straight Weeks

Telah Terbit: Sep 06, 2017 15:19 (GMT+8)
Net long positions on LME lead increased 1,153 to 21,545 lots in the week ended September 1, after falling for three weeks in a row, according to the LME.

SHANGHAI, Sept. 6 (SMM) – Net long positions on LME lead held by fund managers grew in the week ended September 1 after falling for three weeks in a row.

LME Zinc Net Long Positions Grow

Positions increased 1,153 to 21,545 lots in the week ended September 1, according to the LME. 

LME Tin Net Long Positions Increase for 3 Weeks on End on Market Optimism

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn