Shanshan Corporation Enjoys Booming Li-Ion Battery Cathode Material Business, and to Build Anode Material Project 

Telah Terbit: Aug 16, 2017 10:40
Ningbo Shanshan Corporation posted a strong earnings report in H1 2017, mainly thanks to a big boost in cathode materials business.

SHANGHAI, Aug. 16 (SMM) – Ningbo Shanshan Corporation posted a strong earnings report in H1 2017, mainly thanks to a big boost in cathode materials business.

The company reported 3.85 billion yuan in revenues in H1, up 57.79% year-on-year, and 339.05 million yuan in net profit attributable to shareholders of listed company, up 51.49% year-on-year.

Its subsidiary company Shanshan Technology plans to build a 100,000 tonne/year Li-ion battery anode material project in Baotou, with total investment at 3.81 billion yuan.   
 
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
[SMM Analysis] Laba Lebih Kuat, Namun Elastisitas Pasokan Terbatas: Tinjauan Tambang Molibdenum Amerika H1 2026
12 Sep 2026 00:05
[SMM Analysis] Laba Lebih Kuat, Namun Elastisitas Pasokan Terbatas: Tinjauan Tambang Molibdenum Amerika H1 2026
Baca Selengkapnya
[SMM Analysis] Laba Lebih Kuat, Namun Elastisitas Pasokan Terbatas: Tinjauan Tambang Molibdenum Amerika H1 2026
[SMM Analysis] Laba Lebih Kuat, Namun Elastisitas Pasokan Terbatas: Tinjauan Tambang Molibdenum Amerika H1 2026
Pada H1 2026, divergensi pasokan molibdenum di Amerika semakin dalam. Meskipun laba pertambangan menguat, output keseluruhan gagal pulih. Meski H2 mungkin melihat pemulihan di beberapa tambang besar, elastisitas pasokan tetap terbatas. Operasi mana yang menekan pasokan, dan di mana pertumbuhan inkremental akan muncul? Data SMM mengungkap pasar memasuki fase baru "margin lebih kuat, produksi divergen, dan keuntungan inkremental terkonsentrasi."...
12 Sep 2026 00:05
[SMM Tinjauan Mingguan Kromium] Aliran Bijih Krom Meningkat Kembali seiring Stok Pelabuhan China Bertambah, Zimbabwe Incar Kapasitas Ferokrom
11 Sep 2026 20:21
[SMM Tinjauan Mingguan Kromium] Aliran Bijih Krom Meningkat Kembali seiring Stok Pelabuhan China Bertambah, Zimbabwe Incar Kapasitas Ferokrom
Baca Selengkapnya
[SMM Tinjauan Mingguan Kromium] Aliran Bijih Krom Meningkat Kembali seiring Stok Pelabuhan China Bertambah, Zimbabwe Incar Kapasitas Ferokrom
[SMM Tinjauan Mingguan Kromium] Aliran Bijih Krom Meningkat Kembali seiring Stok Pelabuhan China Bertambah, Zimbabwe Incar Kapasitas Ferokrom
11 September 2026.
11 Sep 2026 20:21
[SMM Kilasan Kromium] Transisi Bawah Tanah Tharisa di Tambang Utama Krom-PGM Tetap Sesuai Jadwal
11 Sep 2026 20:12
[SMM Kilasan Kromium] Transisi Bawah Tanah Tharisa di Tambang Utama Krom-PGM Tetap Sesuai Jadwal
Baca Selengkapnya
[SMM Kilasan Kromium] Transisi Bawah Tanah Tharisa di Tambang Utama Krom-PGM Tetap Sesuai Jadwal
[SMM Kilasan Kromium] Transisi Bawah Tanah Tharisa di Tambang Utama Krom-PGM Tetap Sesuai Jadwal
Tharisa mengonfirmasi transisinya ke penambangan bawah tanah di Tambang Tharisa andalannya, di sisi barat daya Kompleks Bushveld Afrika Selatan, tetap sesuai jadwal dan anggaran, berjalan paralel dengan pembiayaan konstruksi Proyek Karo Platinum di Zimbabwe. Pengembangan kompleks bawah tanah Apollo, yang dimulai pada Maret 2026, berjalan menuju bijih run-of-mine pertama pada kuartal ini, dengan target produksi kondisi tunak sebesar 255.000 mt per bulan pada kuartal ketiga tahun kalender 2029. Kompleks Orion diperkirakan menyusul, dengan target bijih pertama pada tahun fiskal 2031 dan produksi kondisi tunak pada kuartal ketiga tahun kalender 2033. Secara keseluruhan, Tharisa menyatakan kedua kompleks bawah tanah tersebut diperkirakan akan memperpanjang penambangan di Tambang Tharisa, yang memproduksi konsentrat krom bersama PGM dari badan bijih yang sama, selama lebih dari 60 tahun setelah habisnya pit terbuka saat ini. Proyek bawah tanah ini sepenuhnya didanai melalui pinjaman pengembangan dari Absa dan Standard Bank serta fasilitas revolving berbasis aset dari Nedbank, pendanaan yang terpisah dari obligasi Nordik senilai US$300 juta yang diterbitkan minggu ini untuk Karo. Perusahaan tidak merinci berapa bagian dari output bijih run-of-mine masa depan Apollo atau Orion yang akan berupa material mengandung krom versus material mengandung PGM, sehingga dampak spesifik transisi bawah tanah terhadap volume konsentrat krom Tharisa masih perlu diklarifikasi seiring kedua kompleks tersebut meningkatkan produksi menuju kondisi tunak.
11 Sep 2026 20:12