Hebei’s Handan to Complete Steel Capacity Cut Work before Late September

Telah Terbit: Jul 14, 2017 09:53
Handan, a city located in the southwestern part of Hebei province, said to complete steel capacity reduction work before the end of September, local media reported.

SHANGHAI, Jul. 14 (SMM) – Handan, a city located in the southwestern part of Hebei province, said to complete steel capacity reduction work before the end of September, local media reported. 

Crude Steel Daily Output at CISA Members Reaches 1.87 Million tonnes in Last 10 Days of June

Within 2017, Handan is required to eliminate iron-smelting capacity by 4.68 million tonnes, and steel-making capacity by 2 million tonnes, and now it has advanced its finishing date. 

The city also needs to cut coal capacity by 1.87 million tonnes, close eleven 307,000-kw thermal power units, and five coke ovens as well, and to reduce coke capacity by 2.80 million tonnes in the year of 2017.

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or limited. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Proyek Ekspansi JCC Hongyuan Copper Senilai 200 Juta Dolar AS Bertujuan Meningkatkan Kapasitas Menjadi 550.000 Ton pada 2027
7 Sep 2026 15:43
Proyek Ekspansi JCC Hongyuan Copper Senilai 200 Juta Dolar AS Bertujuan Meningkatkan Kapasitas Menjadi 550.000 Ton pada 2027
Baca Selengkapnya
Proyek Ekspansi JCC Hongyuan Copper Senilai 200 Juta Dolar AS Bertujuan Meningkatkan Kapasitas Menjadi 550.000 Ton pada 2027
Proyek Ekspansi JCC Hongyuan Copper Senilai 200 Juta Dolar AS Bertujuan Meningkatkan Kapasitas Menjadi 550.000 Ton pada 2027
Proyek perluasan katoda tembaga 300.000 ton/tahun milik JCC Hongyuan Copper, anak perusahaan Jiangxi Copper Corporation, memasuki tahap pengumuman publik pra-persetujuan penilaian dampak lingkungan pada 4 September, dengan total investasi sekitar 1,416 miliar yuan. Proyek ini direncanakan mulai dibangun pada September 2026 dan selesai pada Desember 2027. Setelah selesai, total kapasitas JCC Hongyuan akan melonjak dari 250.000 ton menjadi 550.000 ton.
7 Sep 2026 15:43
Yen Jepang Menguat USD/JPY Turun di Bawah 159 di Tengah Spekulasi Intervensi
3 Sep 2026 19:00
Yen Jepang Menguat USD/JPY Turun di Bawah 159 di Tengah Spekulasi Intervensi
Baca Selengkapnya
Yen Jepang Menguat USD/JPY Turun di Bawah 159 di Tengah Spekulasi Intervensi
Yen Jepang Menguat USD/JPY Turun di Bawah 159 di Tengah Spekulasi Intervensi
[SMM Kilat Logam Mulia] Yen Jepang melonjak tajam selama perdagangan Rabu, dengan USD/JPY turun di bawah 159 dan ditutup melemah 0,92% di 158,69, memicu spekulasi intervensi mata uang Jepang. Indeks dolar juga turun tajam, dengan lingkungan dolar yang lebih lemah memberikan dukungan bagi logam mulia.
3 Sep 2026 19:00
Wuhu Menyetujui Analisis Dampak Lingkungan untuk Proyek Baterai Timbal-Karbon 500.000 kVAh milik Anhui Motu
26 Aug 2026 17:02
Wuhu Menyetujui Analisis Dampak Lingkungan untuk Proyek Baterai Timbal-Karbon 500.000 kVAh milik Anhui Motu
Baca Selengkapnya
Wuhu Menyetujui Analisis Dampak Lingkungan untuk Proyek Baterai Timbal-Karbon 500.000 kVAh milik Anhui Motu
Wuhu Menyetujui Analisis Dampak Lingkungan untuk Proyek Baterai Timbal-Karbon 500.000 kVAh milik Anhui Motu
[Dinamika Perusahaan Baterai Timbal-Asam] Baru-baru ini, Biro Ekologi dan Lingkungan Kota Wuhu menerbitkan opini persetujuan, dan analisis dampak lingkungan untuk proyek perakitan baterai timbal-karbon dengan kapasitas produksi tahunan 500.000 kVAh dari Anhui Motu Technology Group Co., Ltd. secara resmi disetujui. Perusahaan akan menerapkan berbagai langkah perlindungan lingkungan sesuai dengan persyaratan persetujuan analisis dampak lingkungan, melanjutkan pekerjaan pendahuluan selanjutnya, dan memulai konstruksi proyek setelah semua kondisi siap.
26 Aug 2026 17:02
Hebei’s Handan to Complete Steel Capacity Cut Work before Late September - Shanghai Metals Market (SMM)