SMM estimates that 974,700 mt of pig iron output will be lost from blast furnace maintenance during Jun 29-July 5, down 89,500 mt on a weekly basis. SMM estimates that 1.0402 million mt of pig iron output will be lost from blast furnace maintenance during July 6-12, up 65,500 mt on a weekly basis.
Rebar: 1.0041 million mt of output will be lost from maintenance during Jun 29-July 5, down 44,700 mt on a weekly basis; 927,600 mt of output will be lost from maintenance during July 6-12, down 76,500 mt on a weekly basis.
HRC: 112,000 mt of output will be lost from maintenance during Jun 29-July 5, down 36,500 mt on a weekly basis; 136,400 mt of output will be lost from maintenance during July 6-12, up 24,400 mt on a weekly basis.
Medium-thick plates: 80,000 mt of output will be lost from maintenance during Jun 29-July 5, up 80,000 mt on a weekly basis; 0 mt of output will be lost from maintenance during July 6-12, down 80,000 mt on a weekly basis.

![Les prix du magnésium augmentent pour la troisième séance consécutive ! Le côté coûts reste « brûlant » tandis que la demande peine à prendre le relais [Commentaire SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)
![[ Le Canada imposera des droits de douane de rétorsion de 50 % sur l’acier américain ]](https://imgqn.smm.cn/usercenter/QMaot20251217171719.jpg)
