SMM estimates that 1.0221 million mt of pig iron output will be lost from blast furnace maintenance during Jun 22-28, down 31,900 mt on a weekly basis. SMM estimates that 899,900 mt of pig iron output will be lost from blast furnace maintenance during Jun 29-July 5, down 122,200 mt on a weekly basis.
Rebar: 1.0212 million mt of output will be lost from maintenance during Jun 22-28, down 116,700 mt on a weekly basis; 908,700 mt of output will be lost from maintenance during Jun 29-July 5, down 112,500 mt on a weekly basis.
HRC: 148,500 mt of output will be lost from maintenance during Jun 22-28, down 5,000 mt on a weekly basis; 73,500 mt of output will be lost from maintenance during Jun 29-July 5, down 75,000 mt on a weekly basis.
Medium-thickness plate: 0 mt of output will be lost from maintenance during Jun 22-28, flat on a weekly basis; 80,000 mt of output will be lost from maintenance during Jun 29-July 5, up 80,000 mt on a weekly basis.

![Les prix du magnésium augmentent pour la troisième séance consécutive ! Le côté coûts reste « brûlant » tandis que la demande peine à prendre le relais [Commentaire SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)
![[ Le Canada imposera des droits de douane de rétorsion de 50 % sur l’acier américain ]](https://imgqn.smm.cn/usercenter/QMaot20251217171719.jpg)
