State Power Investment Corporation Announces Tender for Taicang Xinrong Energy Storage Power Station Phase I 100MW/200MWh Project EPC General Contract

Publié: Jan 10, 2024 09:17
【Taicang Xinrong Energy Storage Power Station Phase I 100MW/200MWh Project EPC General Contract Tender】On January 9th, State Power Investment Corporation announced the tender for the EPC general contract of the Taicang Xinrong 200MW/400MWh energy storage power station Phase I 100MW/200MWh project. The scope of the tender includes survey and design, equipment procurement (including energy storage system), construction of building and electrical installation, commissioning, testing, acceptance, and handover for the Phase I 100MW/200MWh project (including the opposite side station) of the Taicang Xinrong 200MW/400MWh energy storage power station. The announcement indicates that the project is scheduled to start in February 2024 and to be grid-connected and put into operation in June 2024.

Déclaration sur la source des données : À l'exception des informations publiques, toutes les autres données sont traitées par SMM sur la base d'informations publiques, d'échanges avec le marché et en s'appuyant sur le modèle de base de données interne de SMM. Ils sont fournis à titre indicatif uniquement et ne constituent pas des recommandations décisionnelles.

Pour toute demande d'information ou pour en savoir plus, veuillez contacter : lemonzhao@smm.cn
Pour plus d'informations sur l'accès à nos rapports de recherche, veuillez contacter :service.en@smm.cn