Intensive Blast Furnace Maintenance in Shanxi Drags Down Overall Operating Rates Sharply, SMM Survey

Publié: Apr 26, 2023 16:49
Source: SMM
According to SMM research, as of April 26, the average operating rate of blast furnaces surveyed by SMM was 93.31%, a decrease of 1.94 percentage points from a week earlier.

According to SMM research, as of April 26, the average operating rate of blast furnaces surveyed by SMM was 93.31%, a decrease of 1.94 percentage points from a week earlier. The blast furnace capacity utilization rates averaged 94.76%, also a decrease of 1.65 percentage points from the previous week.

The average daily pig iron output of the sample steel mills was 2.2671 million mt, a decrease of 39,500 mt from the previous week.

Region

Apr 19

Apr 26

BF operating rates

95.25%

93.31%

BF capacity utilisation rates

96.41%

94.76%

Daily average pig iron production of sample steel mills (10,000 mt)

230.66

226.71

Estimated daily average pig iron production of steel mills across Chia (10,000 mt)

265.53

265.53

Déclaration sur la source des données : À l'exception des informations publiques, toutes les autres données sont traitées par SMM sur la base d'informations publiques, d'échanges avec le marché et en s'appuyant sur le modèle de base de données interne de SMM. Ils sont fournis à titre indicatif uniquement et ne constituent pas des recommandations décisionnelles.

Pour toute demande d'information ou pour en savoir plus, veuillez contacter : lemonzhao@smm.cn
Pour plus d'informations sur l'accès à nos rapports de recherche, veuillez contacter :service.en@smm.cn
Intensive Blast Furnace Maintenance in Shanxi Drags Down Overall Operating Rates Sharply, SMM Survey - Shanghai Metals Market (SMM)