Post-holiday purchases from wire, cable plants lift processing charges of aluminium rod

Publié: Feb 21, 2019 13:14 (GMT+8)
In the first post-CNY week ended Feb 15, average processing charges of aluminium rod in Shandong rebounded 70 yuan/mt from pre-holiday

SHANGHAI, Feb 21 (SMM) – Expectations of greater orders at downstream manufacturers of aluminium wire and cable drove them to stockpile aluminium rod as raw materials in the first week after the CNY holiday, and this lifted significantly the processing charges of aluminium rod during the same period. 

SMM also learned that post-holiday inventories at aluminium rod processors stood below than a year ago, as some cable and wire plants ordered cargoes ahead of CNY. This also prompted aluminium rod processors to firm up offers. 

In the first post-CNY week ended February 15, average processing charges of aluminium rod in Shandong rebounded some 70 yuan/mt from pre-holiday, to 320 yuan/mt as of February 15, with the lowest prices rising 90 yuan/mt. 

Aluminium rod processors were eager to destock ahead of CNY breaks, in order to control in-plant inventories amid normal production during CNY. This pushed them to lower offers of processing fees, and led to a lower base before the holiday.  

As of February 1, average processing charges in Shandong dipped to a low of 260 yuan/mt and that in Henan to a low of 255 yuan/mt. SMM assessments showed that the fees typically declined by some 100 yuan/mt during the week before Lunar New Year. 

While aluminium wire and cable manufacturers restocked, downstream demand has yet to resume fully as workers only returned after February 19. This will depress operating rate across those manufacturers in February. 

Operating rates across Chinese manufacturers of aluminium wire and cable averaged 32.8% in January, unchanged from December but fell 14 percentage points from a year ago, SMM research found. For March, expectations of downstream orders are likely to buoy the rate to 50%.

Déclaration sur la source des données : À l'exception des informations publiques, toutes les autres données sont traitées par SMM sur la base d'informations publiques, d'échanges avec le marché et en s'appuyant sur le modèle de base de données interne de SMM. Ils sont fournis à titre indicatif uniquement et ne constituent pas des recommandations décisionnelles.

Pour toute demande d'information ou pour en savoir plus, veuillez contacter : lemonzhao@smm.cn
Pour plus d'informations sur l'accès à nos rapports de recherche, veuillez contacter :service.en@smm.cn
Actualités Connexes
[SMM Flash Info] South32 a révisé son offre de prime CIF MJP pour le T4 2026 à 265 $/t
il y a 15 heures
[SMM Flash Info] South32 a révisé son offre de prime CIF MJP pour le T4 2026 à 265 $/t
Lire la suite
[SMM Flash Info] South32 a révisé son offre de prime CIF MJP pour le T4 2026 à 265 $/t
[SMM Flash Info] South32 a révisé son offre de prime CIF MJP pour le T4 2026 à 265 $/t
Sources du marché : South32 a révisé son offre de prime MJP CIF pour le T4 2026 à 265 $/t, contre 325 $/t. Validité jusqu'au 5 octobre 2026.
il y a 15 heures
L'ADC 12 indien se maintient malgré la baisse de l'aluminium au LME ; l'offre restreinte de ferraille limite le repli
01 Oct 2026 17:48 (GMT+8)
L'ADC 12 indien se maintient malgré la baisse de l'aluminium au LME ; l'offre restreinte de ferraille limite le repli
Lire la suite
L'ADC 12 indien se maintient malgré la baisse de l'aluminium au LME ; l'offre restreinte de ferraille limite le repli
L'ADC 12 indien se maintient malgré la baisse de l'aluminium au LME ; l'offre restreinte de ferraille limite le repli
Les prix de l'ADC 12 en Inde sont restés relativement résistants malgré une baisse de 1,2 % des prix de l'aluminium à 3 mois sur le LME entre le 24 et le 30 septembre.
01 Oct 2026 17:48 (GMT+8)
Rio Tinto sécurise les opérations de la fonderie de Bell Bay jusqu’à fin 2031
01 Oct 2026 17:09 (GMT+8)
Rio Tinto sécurise les opérations de la fonderie de Bell Bay jusqu’à fin 2031
Lire la suite
Rio Tinto sécurise les opérations de la fonderie de Bell Bay jusqu’à fin 2031
Rio Tinto sécurise les opérations de la fonderie de Bell Bay jusqu’à fin 2031
Rio Tinto a annoncé le 1er octobre avoir conclu des accords avec le gouvernement de Tasmanie, le gouvernement fédéral australien et Hydro Tasmania pour prolonger l'approvisionnement en électricité de la fonderie d'aluminium de Bell Bay jusqu'à fin 2031. Les deux gouvernements fourniront également une enveloppe de soutien combinée de 200 millions de dollars australiens sur cinq ans, à hauteur de 100 millions chacun. Les conditions commerciales de l'accord sur l'électricité n'ont pas été divulguées. Bell Bay produit environ 190 000 tonnes d'aluminium primaire par an, tandis que son contrat d'électricité actuel devait expirer fin 2026. L'accord lève l'incertitude opérationnelle immédiate de la fonderie. Bell Bay est la troisième grande fonderie d'aluminium australienne à bénéficier d'un soutien public en 2026, après Boyne et Tomago, ce qui souligne la pression persistante des coûts élevés de l'électricité et de la concurrence internationale.
01 Oct 2026 17:09 (GMT+8)