SHANGHAI, Aug. 9 (SMM) – JXTG Holdings announced to lower copper output target for 2017 at its Caserones copper mine in Chile, as power cut suspended output in May.
Why China Unwrought Copper and Copper Semis Imports Down in January-July? SMM Reports
The company expects copper concentrate output to be 110,000 tonnes on March 31, 2018 fiscal year, which was lower than anticipation of 130,000 tonnes in May.
China Copper Cathode Output Falls in July, and to Rise in August, SMM Reports
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
![High copper prices and raw material shortages constrain each other, with overseas copper scrap coefficients remaining stable [SMM Weekly Review on Secondary Copper Raw Materials Outside China]](https://imgqn.smm.cn/usercenter/qcyEh20251217171709.jpg)
![Enquête sur les congés des entreprises de transformation pendant les vacances de la fête nationale 2026 de SMM – Tôles, plaques et bandes de cuivre [Analyse SMM] [Analyse SMM]](https://imgqn.smm.cn/usercenter/EFLYr20251217171714.jpeg)
![Risque de grève à Escondida, perturbations de l'offre de minerai s'intensifient [Résumé de la réunion matinale de SMM sur le cuivre]](https://imgqn.smm.cn/usercenter/CaLPF20251217171713.jpg)
