Yunnan Zhenxing Industry Group Puts Online 100,000-tonne Crude Lead Project

Publié: Sep 7, 2015 13:36
Yunnan Zhenxing Industry Group put 100,000 tonnes of crude lead project into operation recently, SMM understands.

SHANGHAI, Sept. 7 (SMM) - Yunnan Zhenxing Industry Group put 100,000 tonnes of crude lead project into operation recently, SMM understands.

The project employs advanced crude lead smelting technology and mainly uses lead ore as raw materials currently. But with the advancement of technology, the project will make use of various raw materials to ensure low energy consumption and high efficiency.

The old 80,000-tonne capacity of crude lead was closed. Refined lead capacity is left unchanged and refined lead production is expected to be 3,000 tonnes in August. 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn

Déclaration sur la source des données : À l'exception des informations publiques, toutes les autres données sont traitées par SMM sur la base d'informations publiques, d'échanges avec le marché et en s'appuyant sur le modèle de base de données interne de SMM. Ils sont fournis à titre indicatif uniquement et ne constituent pas des recommandations décisionnelles.

Pour toute demande d'information ou pour en savoir plus, veuillez contacter : lemonzhao@smm.cn
Pour plus d'informations sur l'accès à nos rapports de recherche, veuillez contacter :service.en@smm.cn
Yunnan Zhenxing Industry Group Puts Online 100,000-tonne Crude Lead Project - Shanghai Metals Market (SMM)