[Galan Lithium Announces Completion of Phase 1 Construction at HMW Project]

Published: Apr 1, 2026 14:11
On April 1, Galan Lithium announced that Phase 1 construction of its Hombre Muerto West (HMW) Project has been successfully completed. The project has now fully transitioned to the commissioning and operational readiness phase, with all major process facilities, including the nanofiltration plant, installed and electrical and mechanical testing underway. Supported by substantial brine inventory, first lithium chloride production is expected in 2026. As of April 2026, the project has 10,000 tonnes LCE of brine inventory available for processing. Initial production capacity is 4,000 tonnes LCE per annum, with plans to expand to 5,200 tonnes LCE in the near term.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Lithium Battery Exports Surge 63% in Jan-Feb 2026, Prices Stabilize After Sharp Drops
Apr 3, 2026 19:30
Lithium Battery Exports Surge 63% in Jan-Feb 2026, Prices Stabilize After Sharp Drops
Read More
Lithium Battery Exports Surge 63% in Jan-Feb 2026, Prices Stabilize After Sharp Drops
Lithium Battery Exports Surge 63% in Jan-Feb 2026, Prices Stabilize After Sharp Drops
According to data from the CPCA, lithium battery exports reached 926,000 mt in January-February 2026, up 63%, while export value rose 43% to $14.2 billion. The export price of lithium-ion batteries fell from $27,300/mt in 2023 and $20,100/mt in 2024 to $15,700/mt, and further to $15,300/mt in 2026. The average price in 2026 declined only 10% YoY, a marked improvement from the 26% drop in 2024 and the 22% drop in 2025.
Apr 3, 2026 19:30
Chengtun Group, Leader in Energy Metals, Invests 2B Yuan in Western HQ Project Completion
Apr 3, 2026 14:46
Chengtun Group, Leader in Energy Metals, Invests 2B Yuan in Western HQ Project Completion
Read More
Chengtun Group, Leader in Energy Metals, Invests 2B Yuan in Western HQ Project Completion
Chengtun Group, Leader in Energy Metals, Invests 2B Yuan in Western HQ Project Completion
Chengtun Group has deeply cultivated the energy metals sector, including lithium, nickel, cobalt, and copper, and owns two publicly listed firms: Chengxin Lithium (002240) and Chengtun Mining (600711).
Apr 3, 2026 14:46
"Zhongneng Optoelectronics Breaks Ground on 900-Unit Annual Battery Equipment Project, Set for 2028 Completion"
Apr 3, 2026 14:44
"Zhongneng Optoelectronics Breaks Ground on 900-Unit Annual Battery Equipment Project, Set for 2028 Completion"
Read More
"Zhongneng Optoelectronics Breaks Ground on 900-Unit Annual Battery Equipment Project, Set for 2028 Completion"
"Zhongneng Optoelectronics Breaks Ground on 900-Unit Annual Battery Equipment Project, Set for 2028 Completion"
Phase I of Zhongneng Optoelectronics (Taizhou) Co., Ltd.'s project for the annual production of 900 units of specialized battery equipment involves an investment of 500 million yuan, with a construction period of 27 months, and is scheduled to be completed and put into operation by the end of 2028. Upon completion, the project will have an annual production capacity of 900 units of specialized battery equipment.
Apr 3, 2026 14:44