SEPCOIII's Qinghai-Henan UHV DC Photovoltaic Project (Section 1) Achieves Full-Capacity Grid Connection, Praised for Minimal Defects

Publicado: Oct 10, 2024 17:55
SEPCOIII's Qinghai-Henan UHV DC Photovoltaic Project (Section 1) has successfully achieved full-capacity grid-connected power generation. Located in the southern part of the Ecological Solar Power Generation Park in Hainan Prefecture, Qinghai Province, with an altitude ranging from 3,041 to 3,087 meters, the project is divided into three sections. Among them, Section 1 has a capacity of 400MW, Section 2 300MW, and Section 3 200MW. It is worth mentioning that Section 1, which is undertaken by SEPCOIII Electric Power Construction Corporation Ningxia Electric Power Construction Company, has the fewest defects among all sections, with all inverters and box-type substations operating normally, thus earning high praise from the construction unit.

Declaración de Fuente de Datos: Excepto la información disponible públicamente, todos los demás datos son procesados por SMM basándose en información pública, comunicación de mercado y confiando en el modelo de base de datos interna de SMM. Son solo para referencia y no constituyen recomendaciones para la toma de decisiones.

Para cualquier consulta o para obtener más información, por favor contacte: lemonzhao@smm.cn
Para más información sobre cómo acceder a nuestros informes de investigación, contacte con:service.en@smm.cn