Three Gorges Group Announces Re-bidding for Xinjiang Jimusa Light Storage Project Vanadium Flow Battery Energy Storage Design and Construction Contract

Publicado: Jan 18, 2024 09:04

Three Gorges Energy Xinjiang Jimusa Light Storage Project 200MW/1000MWh Vanadium Flow Battery Energy Storage Design and Construction General Contract Rebid

On January 17, Three Gorges Group announced the re-bidding of the general contract for the design and construction of the 200MW/1000MWh vanadium flow battery energy storage system for the Three Gorges Energy Xinjiang Jimusa Light Storage Project. The project will mainly consist of vanadium flow battery electrolyte, storage tanks, stacks, thermal management system, circulation system, battery management system (BMS), energy management system (EMS), self-use power system, distribution equipment, inverters (PCS) and booster transformers, supporting auxiliary facilities and construction engineering.

Declaración de Fuente de Datos: Excepto la información disponible públicamente, todos los demás datos son procesados por SMM basándose en información pública, comunicación de mercado y confiando en el modelo de base de datos interna de SMM. Son solo para referencia y no constituyen recomendaciones para la toma de decisiones.

Para cualquier consulta o para obtener más información, por favor contacte: lemonzhao@smm.cn
Para más información sobre cómo acceder a nuestros informes de investigación, contacte con:service.en@smm.cn
Three Gorges Energy Xinjiang Jimusa Light Storage Project 200MW/1000MW - Shanghai Metals Market (SMM)