[SMM Daily Review] the rework rate of small and medium-sized enterprises continued to increase, crude oil fell nearly 6% in the metal market, and steel stocks continued to decline under pressure in the metal market. Steel volatility is on the strong side.

Publicado: Apr 16, 2020 16:54
Most of the non-ferrous metals market closed lower today as crude oil tumbled again. However, according to the Ministry of Industry and Information Technology, according to the monitoring of big data on some cloud platforms, as of April 15, the rework rate of small and medium-sized enterprises nationwide reached 84%.

SMM4 16: most of the non-ferrous metals market closed down today, due to the collapse of crude oil again dragged down. However, according to the Ministry of Industry and Information Technology, according to the monitoring of big data on some cloud platforms, as of April 15, the rework rate of small and medium-sized enterprises nationwide reached 84%. The rate of return to work in all regions has shown a trend of going hand in hand, with the rework rate of more than 80% in 25 provinces, including Hubei Province, which has also shown a rapid upward trend in recent days. Zinc rose 0.6 per cent in Shanghai. At present, the domestic zinc smelter raw material inventory is low, the average number of days is 19 days, the minimum existence of 5 days 10 days of the refinery, in order to maintain the completion of the annual production plan, the smelter will not easily reduce production, resulting in a high demand for mines, and mines due to low prices, poor willingness to ship, foreign trade deliberate hoarding, resulting in rapid reduction of processing fees, we believe that there is the possibility of processing fees continue to be reduced in the short term. Shanghai tin slightly fell, SMM believes that in the recent weak situation in supply and demand, Shanghai tin prices affected by the epidemic situation and the macro situation at home and abroad fluctuated violently, the previous session to 40-60 days moving average of 128880 yuan / ton after the action can be blocked, from the disk technical indicators, the recent need to guard against the risk of a pullback from a high level in the near future.

Black iron ore fell 0.33%, thread hot coil rose slightly. Consumption of threaded steel continues to rise and inventories continue to fall. The data show that the total thread warehouse has been reduced by more than 1 million tons, rapid depot under high production, strong demand growth, and short-term upward expectations. In the later stage of iron ore demand in foreign countries is generally affected, the shift to domestic resources has an increasing trend. But (Ibram), the Brazilian mining association, said on Wednesday that mineral output in Brazil fell 17 per cent in the first quarter of 2020 compared with the same period last year, and the impact of the new crown pneumonia outbreak on the industry in the second quarter was expected to deepen. Iron ore exports fell 17 per cent to 70.3 million tonnes in the first quarter from a year earlier. In the later stage, attention should be paid to the shipment of iron ore to China.

Crude oil fell 5.86% in the previous period. Although OPEC+ reached a crude oil agreement to cut production sharply a few days ago, oil prices did not rebound sharply because of the depressed demand triggered by the epidemic, and the crude oil data in the IEA report once again confirmed the market's bearish expectations, and oil prices tumbled again. WTI crude oil futures fell below $20 a barrel again, down 0.2% on the day, after rising more than 3% at one point, while Brent crude oil futures also fell back to around 1%. Even after unprecedented production cuts, the supply glut will take time to resolve. "substantial increase in inventories & less than expected oil prices to return to the $20 mark

As of today's daytime close:

As of 16:10, the new US dollar denominated small metals contracts on the HKEx are as follows:

Today's capital flow

Commodities fell widely, and the commodity index was dominated by capital outflows, with blood loss approaching 2.4 billion. Iron ore weak shock, daily reduction of more than 50, 000 hands, by more than 500 million funds to sell, and coke was also rejected by more than 400 million funds, black chain index lost more than 1.1 billion funds. The soyabean scenery that led the rise yesterday is no longer, day reduces position nearly 40000 hands, outflow capital volume exceeds 300 million. Fuel oil fell ahead, investors increased their low positions by nearly 100000 hands, and the crude oil plate absorbed a total of more than 500 million gold.

Brief comment of SMM analyst on April 16th

 

Updating.

SMM "current combination" training class

Registration contact: Lu Qingping, SMM Iron and Steel Division

Tel: 021-51595781 / 187-1777-4590

Declaración de Fuente de Datos: Excepto la información disponible públicamente, todos los demás datos son procesados por SMM basándose en información pública, comunicación de mercado y confiando en el modelo de base de datos interna de SMM. Son solo para referencia y no constituyen recomendaciones para la toma de decisiones.

Para cualquier consulta o para obtener más información, por favor contacte: lemonzhao@smm.cn
Para más información sobre cómo acceder a nuestros informes de investigación, contacte con:service.en@smm.cn
Noticias relacionadas
Mejora económica de la mina polimetálica de Boumadine en Marruecos
hace 6 horas
Mejora económica de la mina polimetálica de Boumadine en Marruecos
Leer más
Mejora económica de la mina polimetálica de Boumadine en Marruecos
Mejora económica de la mina polimetálica de Boumadine en Marruecos
hace 6 horas
Greenland Mines completa un programa de muestreo a granel de 104,8 toneladas en el proyecto Skaergaard PGM
hace 9 horas
Greenland Mines completa un programa de muestreo a granel de 104,8 toneladas en el proyecto Skaergaard PGM
Leer más
Greenland Mines completa un programa de muestreo a granel de 104,8 toneladas en el proyecto Skaergaard PGM
Greenland Mines completa un programa de muestreo a granel de 104,8 toneladas en el proyecto Skaergaard PGM
[SMM Flash] Greenland Mines ha completado un programa de muestreo a granel de 104,8 toneladas en siete sitios de su proyecto de paladio-platino-oro Skaergaard, en el este de Groenlandia. Las muestras se están preparando para pruebas metalúrgicas a escala piloto y de gran escala en GTK Mintec, en Finlandia, mientras la empresa continúa con estudios de ingeniería, procesamiento, infraestructura y gestión de residuos destinados a avanzar en la evaluación técnica del proyecto. El recurso S-K 1300 de Skaergaard comprende actualmente aproximadamente 15,0 millones de onzas de PdEq indicadas y 17,49 millones de onzas de PdEq inferidas, según Greenland Mines. El programa de pruebas a granel representa un paso importante en la evaluación de opciones de procesamiento y recuperación para uno de los mayores sistemas no desarrollados de paladio-platino-oro fuera de las principales regiones de suministro de Sudáfrica, Zimbabue y Rusia. Sin embargo, los recursos minerales informados no son reservas minerales y el programa más reciente no constituye una decisión de desarrollo o producción comercial.
hace 9 horas
Dos Ríos avanza en los trabajos de validación del proyecto Merensky, con una producción potencial de 182.000 onzas 6E al año
hace 9 horas
Dos Ríos avanza en los trabajos de validación del proyecto Merensky, con una producción potencial de 182.000 onzas 6E al año
Leer más
Dos Ríos avanza en los trabajos de validación del proyecto Merensky, con una producción potencial de 182.000 onzas 6E al año
Dos Ríos avanza en los trabajos de validación del proyecto Merensky, con una producción potencial de 182.000 onzas 6E al año
[SMM Flash] Two Rivers, la empresa conjunta de PGM sudafricana entre African Rainbow Minerals e Impala Platinum, está avanzando en los trabajos de validación técnica de su proyecto Merensky en el flanco oriental del Complejo Bushveld. Se aprobó capital para obras iniciales durante el ejercicio 2026 con el fin de completar los estudios necesarios para determinar el camino a seguir del proyecto. El concentrador de Merensky se puso en marcha durante los seis meses hasta diciembre de 2024, pero posteriormente se colocó en cuidado y mantenimiento debido a las difíciles condiciones del mercado de PGM. El proyecto tiene un coste de capital declarado de aproximadamente 7.300 millones de rands y está diseñado para producir alrededor de 182.000 onzas de PGM 6E al año en estado estacionario, junto con aproximadamente 1.600 toneladas anuales de níquel y 1.300 toneladas anuales de cobre. Por lo tanto, una reanudación podría proporcionar un suministro incremental significativo de PGM de una operación sudafricana existente. Sin embargo, el proyecto sigue en validación técnica y no se ha anunciado ninguna fecha de reinicio ni una decisión final para reanudar la producción.
hace 9 horas
[SMM Daily Review] the rework rate of small and medium-sized enterprises continued to increase, crude oil fell nearly 6% in the metal market, and steel stocks continued to decline under pressure in the metal market. Steel volatility is on the strong side. - Shanghai Metals Market (SMM)