SHANGHAI, Mar. 22 (SMM) – Tsingshan Group has put online its whole phase two project, with total capacity of 60,000-tpy (metal content), in Indonesia recently, SMM learns.
Tsingshan Group started production at its phase two project last December, but power supply issues restricted its production capacity, only 30,000-tpy capacity online.
This March, the Group succeeded to produce from the rest of the project, SMM learns.
Tsingshan Group started its trial production at its phase one project in January 2015, producing 20,000 tonnes (metal content) over the year, and will complete construction of phase three project in 2017, according to its plan.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

![El IPP de EE. UU. de agosto supera las expectativas, impulsando las expectativas de subida de tipos; el contrato de estaño más negociado en la SHFE cae por debajo de los 410.000 yuanes [Revisión de mediodía del estaño de SMM]](https://imgqn.smm.cn/usercenter/gbiCe20251217171750.jpg)
![El estaño en la SHFE cerró en 414.050 (-2,18%) durante la noche, con posiciones largas y cortas cautelosas antes de la publicación del IPC del 11 de septiembre [SMM Noticias matutinas del estaño]](https://imgqn.smm.cn/usercenter/LLUUJ20251217171751.jpeg)
