October 19, South Africa’s electricity and energy minister announced that a determination under Section 34 of the Electricity Regulation Act authorized Ekurhuleni to procure 2,400 MW of new capacity from independent power producers. The municipality will remain grid-connected.
The mix comprises 1,237 MW of solar, 780 MW of gas, 183 MW of waste-to-energy and 200 MW of innovative technologies. Solar includes 1,137 MW of embedded generation within the city; gas includes 535 MW of wheeled capacity. The municipality estimates approximately R6.2 billion in infrastructure investment, with construction still to be advanced.



