NioBay reports new Crevier drilling intersections

Published: Oct 15, 2026 14:47 (GMT+8)

[SMM Tantalum and Niobium Flash] NioBay Metals reported initial results on 13 October from its 2026 drilling campaign at the Crevier niobium-tantalum project in Québec, Canada. The company said tantalum intersections in the first 13 holes exceeded the average grade in its latest resource estimate; nine holes included mineralised intervals longer than 15 metres above that average. NioBay holds an 80.2% interest in Crevier. These are exploration results, and the company has not declared a new resource or reserve.

The first roughly 5,000 metres targeted a northern area previously associated with higher tantalum grades. NioBay says further results will feed a resource update after the campaign, which it expects to finish later in October. Any increase in resources or eventual supply of tantalum and niobium oxides remains unproven; this is neither a mine start nor commercial production.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Most-traded SHFE aluminum contract closes midday down 1.78%, hitting a fresh stage low intraday [ADC12 Price Daily Review]
2 hours ago
Most-traded SHFE aluminum contract closes midday down 1.78%, hitting a fresh stage low intraday [ADC12 Price Daily Review]
Read More
Most-traded SHFE aluminum contract closes midday down 1.78%, hitting a fresh stage low intraday [ADC12 Price Daily Review]
Most-traded SHFE aluminum contract closes midday down 1.78%, hitting a fresh stage low intraday [ADC12 Price Daily Review]
[ADC12 Price Daily Commentary: Cast Aluminum Most-Traded Contract Closes Down 1.78% at Midday, Hits New Stage Low Intraday] Today, the most-traded cast aluminum AD2612 contract opened at 22,705 yuan/mt. After briefly touching 22,730 yuan/mt in early trading, it pulled back on resistance and stepped down to the 22,600 yuan/mt level. Intraday, it dipped to 22,520 yuan/mt on heavy volume, hitting a new stage low before stabilizing and rebounding. At midday, it closed at 22,640 yuan/mt, down 410 yuan/mt, or 1.78%, from yesterday's settlement price of 23,050 yuan/mt.
2 hours ago
【Flash | Idaho Copper Study Targets 13,835 Tonnes of Annual Molybdenum Output】
6 hours ago
【Flash | Idaho Copper Study Targets 13,835 Tonnes of Annual Molybdenum Output】
Read More
【Flash | Idaho Copper Study Targets 13,835 Tonnes of Annual Molybdenum Output】
【Flash | Idaho Copper Study Targets 13,835 Tonnes of Annual Molybdenum Output】
Idaho Copper Corporation’s updated preliminary economic assessment for its wholly owned CuMo copper-molybdenum-silver project estimates average annual contained-molybdenum production of 30.5 million pounds (about 13,835 metric tonnes) during the first 21 years of a 46-year mine life. Life-of-mine payable molybdenum is estimated at 906 million pounds (about 410,955 metric tonnes). Initial capital is US$1.169 billion, followed by US$658 million of expansion capital in year five. The company targets completion of a pre-feasibility study in 2028 and has not made a construction decision; the project is not current or near-term supply.
6 hours ago
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
23 hours ago
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
Read More
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
Chile’s National Geology and Mining Service ordered a temporary halt on October 13 at El Teniente’s North Crater waste dump and other areas exposed to avalanche or ground-movement risks, while stating that the order does not suspend the entire division. Amerigo Resources separately said its Minera Valle Central tailings operation was unaffected. El Teniente produced 1,483.1 metric tonnes of contained molybdenum in the first half of 2026, down 34.9% from a year earlier. No disruption to underground mining, concentrators or the molybdenum recovery circuit has been confirmed; SMM is not revising its forecast.
23 hours ago
[SMM Tantalum and Niobium Flash] NioBay Metals reported initial resul - Shanghai Metals Market (SMM)