[GlobalFoundries to build new New York fab worth up to 21 billion USD; Renesas to procure output, Tokyo Electron to supply tools]

Published: Oct 15, 2026 10:23 (GMT+8)
GlobalFoundries (GF) will build a new semiconductor fab in New York State, with project scale of up to about 21 billion USD (roughly 3.32 trillion yen). The project sits under the U.S.-bound investment framework agreed by Japan and the U.S. in tariff talks. Renesas Electronics will be procurement partner for the plant's output, while Tokyo Electron supplies equipment. The fab will make chips for automotive, industrial and communications infrastructure. With advanced production concentrated in Taiwan and South Korea, the project aims to strengthen Japan-U.S. supply chains against geopolitical risks; for Japan it also diversifies disaster risk after the July Kumamoto earthquake halted Kyushu plants. It is the third tranche of the 550 billion USD commitment made in July 2025; six projects worth 109 billion USD, about 20%, have been agreed.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[AI memory supercycle squeezes smartphone brands as Q3 shipments fall 20%]
1 hour ago
[AI memory supercycle squeezes smartphone brands as Q3 shipments fall 20%]
Read More
[AI memory supercycle squeezes smartphone brands as Q3 shipments fall 20%]
[AI memory supercycle squeezes smartphone brands as Q3 shipments fall 20%]
AI servers are absorbing global memory supply, inflating smartphone costs. Counterpoint Research data show Q3 global handset shipments fell about 20% y-o-y, the weakest Q3 since 2012, with retail prices up 20%. Samsung raised Galaxy S26 prices on Oct. 1, seven months after launch, lifting the 256GB model by 150,000 won (111 USD) to 1.404 million won; Apple also raised iPhone 18 Pro prices. Chipmakers are shifting capacity to HBM and server DRAM, lifting NAND prices; TrendForce expects handset DRAM prices to rise 8-13% in Q3. Xiaomi's Q3 shipments fell over 30%, Oppo and Vivo over 20%; Samsung led with 23%. It cuts both ways for Samsung: its DS chip arm gains, while the DX division posted an 800 billion won (590 million USD) Q2 loss; Hana Securities sees a 2.1 trillion won (1.56 billion USD) Q3 loss.
1 hour ago
US Fed's October meeting rate hike expectations heat up, most-traded SHFE tin contract continues to decline in night session [SMM Tin Morning Meeting Summary]
2 hours ago
US Fed's October meeting rate hike expectations heat up, most-traded SHFE tin contract continues to decline in night session [SMM Tin Morning Meeting Summary]
Read More
US Fed's October meeting rate hike expectations heat up, most-traded SHFE tin contract continues to decline in night session [SMM Tin Morning Meeting Summary]
US Fed's October meeting rate hike expectations heat up, most-traded SHFE tin contract continues to decline in night session [SMM Tin Morning Meeting Summary]
[SMM Tin Morning Meeting Summary: US Fed October Meeting Rate Hike Expectations Rise, Most-Traded SHFE Tin Contract Continues Downward in Night Session]
2 hours ago
[SEMI: global 300mm fab equipment spending to reach 227 billion USD by 2029]
18 hours ago
[SEMI: global 300mm fab equipment spending to reach 227 billion USD by 2029]
Read More
[SEMI: global 300mm fab equipment spending to reach 227 billion USD by 2029]
[SEMI: global 300mm fab equipment spending to reach 227 billion USD by 2029]
Global 300mm semiconductor fab equipment spending is forecast to reach 227 billion USD by 2029, driven by AI chips, high-performance computing and advanced manufacturing, according to SEMI. Equipment investment will jump 31% year on year to 149 billion USD in 2026, with double-digit growth seen through 2029. Capacity build-out is accelerating: 20 new 300mm fabs or lines are expected to start construction worldwide in 2026, plus 18 in 2027, excluding R&D-only sites. Construction spending will rise 23% to 47.5 billion USD in 2026, a further 33% to 63.3 billion USD in 2027 and 68.4 billion USD in 2028. The Americas lead growth, with regional equipment spending more than doubling from 18.1 billion USD in 2026 to 40.6 billion USD in 2029; the US starts three new fabs in 2026 and four in 2027. Thirteen new fabs or lines will begin operations or ship first silicon in 2026, rising to 23 in 2027. SEMI CEO Ajit Manocha said demand is translating into physical manufacturing expansion. The 300mm Fab Outlook adds 166 updates covering 163 fabs and lines.
18 hours ago