Neo to Provide Separation Tech for Rainbow's Rare Earth Project in South Africa, Aiming 1,800 t/y NdPr Output

Published: Sep 29, 2026 09:49 (GMT+8)
【SMM Rare Earth Flash】 Neo Performance Materials has signed an agreement to provide final solvent extraction separation technology to Rainbow Rare Earths' Phalaborwa project in South Africa. The system will extract rare earths from phosphogypsum, targeting 1,800 t/y NdPr and ~80 t/y Dy/Tb. In return, Neo will receive rights to 40% of annual NdPr output and 65% of the enriched concentrate. The agreement is non-binding, with long-term cooperation terms under negotiation. Testing is underway at Neo's Estonia facility, followed by a pilot separation plant in Johannesburg. Rainbow plans a PFS in Q4 and a DFS in H1 next year.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] Non-China Sintered NdFeB Capacity Map: Tiered Realization of Western Magnetic Material Supply from Estonia's Start of Production
1 hour ago
[SMM Analysis] Non-China Sintered NdFeB Capacity Map: Tiered Realization of Western Magnetic Material Supply from Estonia's Start of Production
Read More
[SMM Analysis] Non-China Sintered NdFeB Capacity Map: Tiered Realization of Western Magnetic Material Supply from Estonia's Start of Production
[SMM Analysis] Non-China Sintered NdFeB Capacity Map: Tiered Realization of Western Magnetic Material Supply from Estonia's Start of Production
In September 2026, Neo Performance Materials announced that its Narva permanent magnet plant in Estonia began commercial production, with the first batch of sintered NdFeB magnets delivered to an EV traction motor client. The plant was commissioned in September 2025, with Phase 1 capacity of 2,000 mt/year and Phase 2 of approximately 5,000 mt/year in the design stage. The long-term global target is 20,000 mt/year, with dysprosium oxide and terbium oxide secured through the Carester agreement. The significance of this event lies not in "adding another 2,000 mt plant," but in bringing the existing base, in-construction growth, and raw material bottlenecks of magnetic material capacity outside China to the table all at once.
1 hour ago
[Note: Translate the Chinese styled brackets "【" and "】" into "[" and "]" respectively.]
1 hour ago
[Note: Translate the Chinese styled brackets "【" and "】" into "[" and "]" respectively.]
Read More
[Note: Translate the Chinese styled brackets "【" and "】" into "[" and "]" respectively.]
[Note: Translate the Chinese styled brackets "【" and "】" into "[" and "]" respectively.]
This week, rare earth prices outside China remained generally stable, with lanthanum oxide edging up and terbium oxide dipping slightly. Developments in overseas project exploration, smelting, and policy were frequent: resource updates in Brazil, Canada, Greenland, and Saudi Arabia; capacity expansions in Japan, France, and by Lynas expected to come online in 2027–2028; Neo's magnet plant commercialization, with a U.S. company securing military orders; Argentina advancing rare earth legislation, and Arafura locking in a long-term wind power agreement. Short-term supply growth is limited, and large-scale release will take time.
1 hour ago
Axel REE Updates Brazil Project: Caladao Resources Grow, Gallium Deposits Expand by 31%
1 hour ago
Axel REE Updates Brazil Project: Caladao Resources Grow, Gallium Deposits Expand by 31%
Read More
Axel REE Updates Brazil Project: Caladao Resources Grow, Gallium Deposits Expand by 31%
Axel REE Updates Brazil Project: Caladao Resources Grow, Gallium Deposits Expand by 31%
【SMM Rare Earth Flash】 Axel REE has updated resources at its Caladao project in Brazil. The Woolrich ionic clay deposit grew 107% to 265 Mt at 0.1101% TREO and 0.00347% Ga₂O₃, including 110 Mt Indicated at 0.1073% TREO. Total Caladao resources rose 24% to 709 Mt at 0.1443% TREO, while gallium resources increased 31% to 580 Mt at 0.00371% Ga₂O₃, one of the world's largest gallium deposits. Column leach tests using warm magnesium sulfate improved recoveries while maintaining a 39% magnet REO ratio. The company plans in-situ recovery (ISR) field trials, positioning itself as a pioneer of low-impact ISR in Minas Gerais.
1 hour ago