[Guangdong Energy Group 2026 Second Batch Centralised Procurement Winning Bid Result Announcement for PV Modules]
On August 19, the winning bid result for Guangdong Energy Group’s 2026 second batch centralized tender procurement project for PV modules was announced. The winning enterprises were Hongyuan Green Energy Co., Ltd. and Hengdian Group DMEGC Magnetics Co., Ltd. The unit price range was 0.654 yuan/W–0.73 yuan/W.
This tender project was Guangdong Energy Group’s 2026 second batch centralized tender procurement for PV modules, covering two PV projects invested in and constructed by Guangdong Energy Group’s subordinate units and their subsidiaries. This module tender was divided into two sections, of which: Section 1 was tentatively 139 MWp, and Section 2 was tentatively 31 MWp. The final procurement quantity was subject to the actual needs of the projects.