Tertiary Minerals Completes Phase 4 Drilling at Zambia’s Mushima North Copper Project

Published: Aug 12, 2026 19:05

Tertiary Minerals Plc has completed its Phase 4 drilling programme at Target A1 within the Mushima North Project in Zambia, with early portable X-Ray Fluorescence (pXRF) results identifying further copper mineralisation and supporting previously identified higher-grade zones.​

The Phase 4 programme comprised 3,639 m of drilling across 39 holes. Early results included an intersection of 15 m grading 0.53% copper from 100 m depth, including 7 m at 0.77% copper. Additional intersections included 4 m at 0.68% copper and 8 m at 0.62% copper, while broader infill intersections returned 65 m at 0.23% copperand 83 m at 0.16% copper.​

Mushima North is a polymetallic silver-copper-zinc prospect located within Zambia’s prospective Iron-Oxide-Copper-Gold region, approximately 28 km east of the historic Kalengwa copper-silver mine. The latest drilling supports the previously identified near-surface Exploration Target of 15–30 million tonnes grading 40–60 g/t silver equivalent, while also providing further indications of higher-grade copper and silver mineralisation within the target area.​

Samples from the drilling programme have been submitted for independent laboratory testing, with certified results expected to be released as they become available. Remaining pXRF results from the final nine holes are also expected, covering additional infill drilling at Target A1 and exploration of mineralisation west of Target A1 and at Target A2.​

With Phase 4 drilling now complete, the project is moving into its next stage of technical evaluation. Initial metallurgical testwork is expected to commence shortly, followed by data compilation and resource modelling. Tertiary Minerals is targeting the delivery of a JORC-compliant Mineral Resource Estimate for Mushima North before the end of 2026, which would provide a clearer assessment of the scale and grade distribution of the mineralised system following the latest drilling campaign.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Copper Prices Rebound Sharply: Bad News Fully Priced In, or Fundamentals Reasserting Themselves?
17 hours ago
Copper Prices Rebound Sharply: Bad News Fully Priced In, or Fundamentals Reasserting Themselves?
Read More
Copper Prices Rebound Sharply: Bad News Fully Priced In, or Fundamentals Reasserting Themselves?
Copper Prices Rebound Sharply: Bad News Fully Priced In, or Fundamentals Reasserting Themselves?
17 hours ago
Doosan Invests $701.5M to Expand CCL Production in Korea and China Through 2028
18 hours ago
Doosan Invests $701.5M to Expand CCL Production in Korea and China Through 2028
Read More
Doosan Invests $701.5M to Expand CCL Production in Korea and China Through 2028
Doosan Invests $701.5M to Expand CCL Production in Korea and China Through 2028
Doosan Group said on September 17 that it will invest approximately KRW 968.4 billion (about USD 701.5 million) to expand high-end copper-clad laminate (CCL) production in South Korea and China. Roughly KRW 421 billion will expand domestic CCL lines for optical modules, while about KRW 547.4 billion will build a new plant in Changshu, China, for AI accelerators and network switches via wholly-owned Doosan Electro-Materials Changshu, with an additional KRW 182.4 billion capital injection. The three-year investment runs through 2028, with new lines scheduled to begin operations in the second half of 2028. In H1 2026, utilization at Doosan's Jeungpyeong and Gimcheon plants reached 109.8% and 102.7%, respectively, while the China plant ran at 92.2%. Q2 2026 optical-module CCL sales jumped more than tenfold year-on-year to about KRW 50 billion, and network-board CCL sales reached KRW 369.2 billion, accounting for more than half of the Electronics Business Group's revenue.
18 hours ago
Copper Cathode Rod Orders Expand, Inventories Decline; Production to Increase 2.31% WoW
19 hours ago
Copper Cathode Rod Orders Expand, Inventories Decline; Production to Increase 2.31% WoW
Read More
Copper Cathode Rod Orders Expand, Inventories Decline; Production to Increase 2.31% WoW
Copper Cathode Rod Orders Expand, Inventories Decline; Production to Increase 2.31% WoW
[SMM Copper Cathode Rod Flash] New orders continued to expand, and with the holiday approaching, finished product inventories destocked at a faster pace. Production willingness at copper cathode rod enterprises strengthened, and the operating rate is expected to rise 2.31 percentage points WoW next week.
19 hours ago