[SMM PV] Perovskite Cells Launched into Space!

Published: May 25, 2026 13:16

At 23:08 on 24 May 2026, the Shenzhou-23 manned spacecraft was launched from the Jiuquan Satellite Launch Center. The flight crew comprises Zhu Yangzhu, Zhang Zhiyuan, and Li Jiaying. The Shenzhou-23 mission will stay in orbit for approximately six months, rotating with the Shenzhou-21 crew, and will carry out experiments on space life sciences, microgravity physics, and perovskite cells, as well as multiple extravehicular activities.

Perovskite cells are third-generation PV cells that use perovskite-structured semiconductor thin films as the light-absorbing layer, directly converting light energy into electrical energy. They feature low cost, ultra-thin and ultra-light design, and high efficiency, and are regarded as the new energy technology most likely to achieve industrialisation. This space experiment will provide efficiency degradation curves under space conditions, and will test and verify the radiation resistance stability and extreme temperature cycling adaptability of perovskite cells.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM PV News]
Jul 24, 2026 11:44
[SMM PV News]
Read More
[SMM PV News]
[SMM PV News]
The PV-grade EVA market continued its upward trend this week. As of now, mainstream quotations from traders have approached 10,500 yuan/mt, and available spot supply in the market is tight. It is expected that next week, the weekly settlement price from major petrochemical plants may reach above 10,000 yuan.
Jul 24, 2026 11:44
[SMM PV Flash] Sichuan's H1 PV equipment and components manufacturing up 7.6% YoY
Jul 24, 2026 11:42
[SMM PV Flash] Sichuan's H1 PV equipment and components manufacturing up 7.6% YoY
Read More
[SMM PV Flash] Sichuan's H1 PV equipment and components manufacturing up 7.6% YoY
[SMM PV Flash] Sichuan's H1 PV equipment and components manufacturing up 7.6% YoY
On July 22, a reporter learned from the Sichuan Provincial Tax Service of the State Taxation Administration that from January to June 2026, Sichuan Province's invoiced sales revenue maintained YoY growth, the industrial economy played an important supporting role in the province's economic growth, and the trend of manufacturing structure optimization and upgrading was evident. Data provided by the Sichuan Provincial Tax Service showed that from January to June, the province's industrial invoiced sales revenue rose 6.9% YoY. By sector, manufacturing was up 7.6% YoY, mining was up 1.7% YoY, and electricity, heat, gas, and water production and supply was up 4.1% YoY. Equipment manufacturing continued to develop. Its invoiced sales revenue from January to June accounted for 50.0% of the province's manufacturing total, up 5.8% YoY. Within this sector, electrical machinery and equipment manufacturing was up 7.1% YoY; the manufacturing of railway, ship, aerospace, and other transport equipment, instrumentation manufacturing, and computer, communication, and other electronic equipment manufacturing rose 47.1%, 13.6%, and 11.9% YoY, respectively. Clean energy equipment manufacturing, a key focus in Sichuan, grew 7.3% YoY, within which the manufacturing of PV equipment and components rose 7.6% YoY. Lithium-ion battery manufacturing increased 22.5% YoY, driving upstream basic chemical raw material manufacturing up 63.7% YoY. Deep-sea oil drilling equipment manufacturing surged 160.0% YoY.
Jul 24, 2026 11:42
[SMM PV Express] Annual carbon reduction exceeds 23,000 mt! Beihai Shipbuilding distributed PV project completed and put into operation
Jul 24, 2026 11:41
[SMM PV Express] Annual carbon reduction exceeds 23,000 mt! Beihai Shipbuilding distributed PV project completed and put into operation
Read More
[SMM PV Express] Annual carbon reduction exceeds 23,000 mt! Beihai Shipbuilding distributed PV project completed and put into operation
[SMM PV Express] Annual carbon reduction exceeds 23,000 mt! Beihai Shipbuilding distributed PV project completed and put into operation
On the 22nd, all construction of the Beihai Shipbuilding "Blue Sail Project" distributed PV project was completed, successfully achieving full-capacity grid-connected power generation. This represents the grid connection and commissioning of another large PV power station for the enterprise, following the successful grid connection of the PV power station in Zone 2 of Beihai Shipbuilding in May this year, marking the full completion and operation of the project.
Jul 24, 2026 11:41