[Yuguang Group Update] Yuguang Details Mines: 860K mt Annual Capacity, Lead, Zinc, Copper, Gold Production

Published: May 15, 2026 19:15
[Lead Smelter Updates] It was reported that Yuguang Gold and Lead Group stated on an interactive platform that Zhuye Group holds the mining rights to the Shuikoushan lead-zinc mine and the Baifang copper mine, with 3 mines (the Kangjiawan mine and the lead-zinc mine both fall under the Shuikoushan lead-zinc mine mining rights) and 1 beneficiation plant, possessing an annual mining and beneficiation capacity of 860,000 mt of raw ore. Its captive mines produce lead concentrates, copper concentrates, gold concentrates, and other mineral products, providing raw material support for its operations.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
High Copper Prices Combined with Wide Price Spread Between Futures Contracts, Market Transactions in Stalemate [SMM Shandong Copper Cathode Spot Weekly Review]
3 mins ago
High Copper Prices Combined with Wide Price Spread Between Futures Contracts, Market Transactions in Stalemate [SMM Shandong Copper Cathode Spot Weekly Review]
Read More
High Copper Prices Combined with Wide Price Spread Between Futures Contracts, Market Transactions in Stalemate [SMM Shandong Copper Cathode Spot Weekly Review]
High Copper Prices Combined with Wide Price Spread Between Futures Contracts, Market Transactions in Stalemate [SMM Shandong Copper Cathode Spot Weekly Review]
3 mins ago
Copper Plate/Sheet and Strip: Copper Prices and Off-Season Weigh on August Operating Rates; YoY Performance Still Strong Supported by Rigid Demand [SMM Analysis]
3 mins ago
Copper Plate/Sheet and Strip: Copper Prices and Off-Season Weigh on August Operating Rates; YoY Performance Still Strong Supported by Rigid Demand [SMM Analysis]
Read More
Copper Plate/Sheet and Strip: Copper Prices and Off-Season Weigh on August Operating Rates; YoY Performance Still Strong Supported by Rigid Demand [SMM Analysis]
Copper Plate/Sheet and Strip: Copper Prices and Off-Season Weigh on August Operating Rates; YoY Performance Still Strong Supported by Rigid Demand [SMM Analysis]
[Copper Plate/Sheet and Strip: Copper Prices and Off-Season Weighed on August Operating Rates, Yet YoY Performance Remained Strong on Rigid Demand Support] According to SMM, the operating rate of the copper plate/sheet and strip industry in August 2026 was...
3 mins ago
Cyclic Materials Opens First U.S. Commercial Recycling Facility, Recovering Copper from 25,000 t/y
1 hour ago
Cyclic Materials Opens First U.S. Commercial Recycling Facility, Recovering Copper from 25,000 t/y
Read More
Cyclic Materials Opens First U.S. Commercial Recycling Facility, Recovering Copper from 25,000 t/y
Cyclic Materials Opens First U.S. Commercial Recycling Facility, Recovering Copper from 25,000 t/y
Cyclic Materials has officially opened its first U.S. commercial-scale recycling facility in Mesa, Arizona, capable of processing up to 25,000 tonnes of magnet-bearing end-of-life products annually. In addition to recovering rare earth magnets, the facility separates copper, aluminum and steel for reintegration into U.S. manufacturing. More than 7,000 tonnes of feedstock have already been delivered, with first commercial shipments expected later in September. The plant adds a new U.S. recycling route for recovering copper and other critical materials from end-of-life vehicles, electronics and magnet-containing equipment.
1 hour ago
[Lead Smelter Updates] It was reported that Yuguang Gold and Lead Grou - Shanghai Metals Market (SMM)