India Has Yet to Decide on Scrapping Pre-Shipment Inspections for Metal Scrap Imports

Published: Oct 01, 2026 09:17 (GMT+8)

India has not yet decided whether to remove the pre-shipment inspection requirement for imported metal scrap, the Directorate General of Foreign Trade said on September 30. The authority is reviewing a proposal from the Material Recycling Association of India and remains open to further easing compliance requirements. MRAI has argued that a shortage of India-authorized inspection agencies in several exporting countries is creating certification and logistical constraints for scrap shipments. Reuters

India imports around 13 million tonnes of recyclable metal scrap annually from more than 160 countries, with roughly 2,500 containers arriving each day. MRAI has proposed recognizing more overseas inspection agencies and expanding the list of low-risk origins exempt from pre-shipment inspections. DGFT said pre-shipment certification and inspections at Indian ports currently serve different purposes and cannot simply replace each other. Any eventual relaxation could reduce compliance barriers for imported scrap, including copper scrap, and broaden sourcing flexibility for Indian buyers, although no policy change has yet been approved.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Kazakhstan and Aurubis Explore Copper Scrap and Secondary Resource Processing Projects
19 mins ago
Kazakhstan and Aurubis Explore Copper Scrap and Secondary Resource Processing Projects
Read More
Kazakhstan and Aurubis Explore Copper Scrap and Secondary Resource Processing Projects
Kazakhstan and Aurubis Explore Copper Scrap and Secondary Resource Processing Projects
Kazakhstan is exploring deeper cooperation with Aurubis in copper recycling and secondary resource processing. During President Kassym-Jomart Tokayev's visit to Germany, the two sides discussed potential joint investments covering complex copper-bearing feedstock processing, associated-metal recovery, recycling and localization of downstream production. Trend Of particular relevance to the copper scrap market, Kazakhstan's state-owned Tau-Ken Samruk and Aurubis are considering cooperation on processing copper scrap and technogenic mineral formations in Kazakhstan, with the parties discussing a joint action plan for prospective projects. No investment amount, processing capacity or specific project has yet been announced, meaning the initiative remains at the discussion stage. If advanced, however, it could extend Aurubis' complex secondary copper feedstock and recycling activities into Central Asia.
19 mins ago
Atico Secures US$111.4 Million Financing Package to Advance La Plata Copper-Gold Project
9 hours ago
Atico Secures US$111.4 Million Financing Package to Advance La Plata Copper-Gold Project
Read More
Atico Secures US$111.4 Million Financing Package to Advance La Plata Copper-Gold Project
Atico Secures US$111.4 Million Financing Package to Advance La Plata Copper-Gold Project
Atico Mining has entered into a US$111.4 million financing package with Trafigura to support the construction and development of its La Plata copper-gold project in Ecuador.​ The package comprises a US$95 million secured project finance facility and a US$16.4 million secured convertible debenture. Under the project finance agreement, Trafigura will make up to US$95 million available for construction and development of La Plata following satisfaction of customary conditions precedent.​ Drawdowns under the project finance facility will be available for approximately 2.5 years following the earlier of the start of construction or March 31, 2027. The facility will mature seven years thereafter and will carry interest at Adjusted Term SOFR plus 7.5% per year.​ Atico also entered into a subscription agreement for a US$16.4 million convertible debenture with an affiliate of Trafigura. The company expects to receive US$16 million in proceeds from the debenture, part of which will be used to repay existing debt, while the remainder will support pre-construction activities at La Plata and general corporate purposes.​ The financing transactions remain subject to customary closing conditions, including approval from the TSX Venture Exchange. Atico expects the private placement and related debt-settlement transaction to close around October 13, 2026, with the first advance under the project finance facility expected thereafter.​ La Plata is a high-grade volcanogenic massive sulphide project in Ecuador containing copper, gold and other metals. Atico currently classifies the project as being at the pre-development stage and plans to use the financing package to advance it toward construction.​ The US$111.4 million financing package represents a significant funding milestone for La Plata and strengthens Atico’s ability to move the project from pre-development toward construction. The US$95 million project finance facility is particularly important because it is directly linked to development of the mine, while the convertible debenture provides additional flexibility for pre-construction work and balance-sheet management. Attention will now turn to satisfaction of the closing conditions, initial drawdown of the project finance facility and the timing of construction activities.
9 hours ago
Selkirk Copper Intersects 9.3% Cu Over 5.4 Metres at Minto North
12 hours ago
Selkirk Copper Intersects 9.3% Cu Over 5.4 Metres at Minto North
Read More
Selkirk Copper Intersects 9.3% Cu Over 5.4 Metres at Minto North
Selkirk Copper Intersects 9.3% Cu Over 5.4 Metres at Minto North
Selkirk Copper Mines has reported additional high-grade drill results from its ongoing Phase 2 programme at the Minto copper-gold-silver project in Yukon, Canada, including one of the highest-grade intersections recorded at the property.​ Step-out drilling at Minto North returned 9.27% copper, 7.43 g/t gold and 54.9 g/t silver, equivalent to 15.11% copper-equivalent, over 5.4 metres in drill hole 26SCM209. The same hole also intersected a separate 9.0-metre interval grading 0.97% copper, 2.58 g/t gold and 8.4 g/t silver, equivalent to 3.11% CuEq.​ Selkirk said the 5.4-metre interval ranks within the 99th percentile of more than 4,300 significant historical drill intercepts at Minto. Individual one-metre samples within the interval returned peak grades of up to 17.5% copper, 15.9 g/t gold and 81.9 g/t silver.​ The company also reported additional mineralisation from Area 118, Minto Main and Copper Keel. At Area 118, infill drilling intersected 2.54% copper, 1.25 g/t gold and 10.7 g/t silver over 3 metres, while another hole returned 1.61% copper, 0.59 g/t gold and 8.3 g/t silver over 6.9 metres.​ Selkirk's Phase 2 programme had originally targeted 50,000 metres of drilling. As of September 28, the company had completed 52,485 metres in 224 drill holes, equivalent to 105% of the planned meterage. Drilling is expected to continue until mid-October, with the remaining work focused on geotechnical data collection, water-monitoring wells and exploration of newly identified geophysical targets.​ The latest Minto North results further demonstrate the presence of high-grade copper-gold-silver mineralisation within areas relevant to Selkirk's planned restart strategy. The 5.4-metre interval is particularly notable because it ranks among the highest-grade intersections historically drilled at Minto. However, these are exploration results rather than additions to the current Mineral Resource Estimate. Attention will therefore remain on how the Phase 2 drilling is incorporated into future resource modelling and feasibility-level mine planning for the proposed restart of the Minto operation.
12 hours ago