Zhejiang Haowei Auto Body Integrated Structural Parts Project Enters Pre-Production Preparation Stage

Published: Apr 22, 2026 13:35
[SMM News] According to reports, Zhejiang Haowei Auto Parts Co., Ltd.'s large die-casting machines are currently in the installation and commissioning stage. The company's 1.8 million-set annual NEV auto body integrated structural parts project is currently in the critical period of equipment installation and commissioning, and plans to gradually commence production in June 2026. Related production equipment has been arriving on-site successively, with overall project progress approximately 30% complete. This year, the foundry workshop will deploy 16 large casting machines, paired with over 100 processing equipment units, and is expected to form an annual capacity of 600,000 battery pack casings by year-end.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Domestic Ports See 170,000 mt Rise in Bauxite Inventory
28 mins ago
Domestic Ports See 170,000 mt Rise in Bauxite Inventory
Read More
Domestic Ports See 170,000 mt Rise in Bauxite Inventory
Domestic Ports See 170,000 mt Rise in Bauxite Inventory
【SMM Port Inventory of Imported Bauxite】According to SMM's statistics on April 24, the total bauxite inventory at ten domestic ports increased by 170,000 mt from the previous week.
28 mins ago
Data: SHFE, DCE market movement (Apr 24)
1 hour ago
Data: SHFE, DCE market movement (Apr 24)
Read More
Data: SHFE, DCE market movement (Apr 24)
Data: SHFE, DCE market movement (Apr 24)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 24 Apr , 2026
1 hour ago
Zhongfu Industrial Invests 363.1M Yuan in 250K mt/year Secondary Aluminum Project
1 hour ago
Zhongfu Industrial Invests 363.1M Yuan in 250K mt/year Secondary Aluminum Project
Read More
Zhongfu Industrial Invests 363.1M Yuan in 250K mt/year Secondary Aluminum Project
Zhongfu Industrial Invests 363.1M Yuan in 250K mt/year Secondary Aluminum Project
[SMM Aluminum News Flash]Zhongfu Industrial announced on April 21 that, to further expand the company's diversified and low-carbon aluminum industry layout, broaden market reach, and strengthen overall market competitiveness, its wholly-owned third-tier subsidiary Qingchuan Zhongfu Secondary Aluminum Alloy Co., Ltd. planned to invest in a secondary aluminum alloy project with an annual capacity of 250,000 mt. The total investment of the project was reportedly 363.1 million yuan. The project was designed to produce 250,000 mt of secondary aluminum annually, including 130,000 mt of 3104 alloy secondary aluminum liquid (ingot) and 120,000 mt of aluminum and aluminum alloy round casting ingots. The construction mainly comprised a scrap pretreatment workshop and a melting and casting workshop.
1 hour ago