Tender Notice for Projects Including Safe and Energy-Efficient Copper Conductor Rails

Published: Mar 16, 2026 19:01

1. Tender Conditions

The tenderer for the tender project Safety and Energy-Saving Copper Conductor Rail and Other Items (AGGFGSHGZHD260309272569) was the Materials Procurement Department of the Equipment and Materials Procurement Center of Angang Steel Company Limited. The funds for the tender project were self-raised, and the project had met the tender conditions. It was now open for public tendering.

2. Project Overview and Tender Scope

2.1 Project Name: Safety and Energy-Saving Copper Conductor Rail and Other Items

2.2 Alternative Procurement Methods in Case of Tender Failure: Direct procurement, negotiation-based procurement

2.3 For the content, scope, and scale of this project tender, please refer to the attachment, Material List Attachment.pdf.

3. Bidder Qualification Requirements

3.1 Consortium bidding was not permitted for this tender.

3.2 The bidder was required to possess the following qualifications for this tender:

See attachment (if required)

3.3 The bidder was required to meet the following registered capital requirements for this tender:

Registered capital for manufacturers: 10.0 million yuan and above

3.4 The bidder was required to have the following performance qualifications for this tender:

See attachment

3.5 The bidder was required to have the following capability requirements, financial requirements, and other requirements for this tender:

Financial requirements: See attachment

Capability requirements: See attachment

Other requirements: See attachment

3.6 For projects that were legally required to undergo tendering, bids submitted by dishonest persons subject to enforcement were invalid.

4. Acquisition of Tender Documents

4.1 Any interested bidder should log in to the Angang Smart Tendering and Bidding Platform at http://bid.ansteel.cn to download the electronic tender documents from 10:00 on March 16, 2026 to 08:00 on April 9, 2026 (Beijing time, the same hereinafter).

Click to view tender details:


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China’s Brass Bar Imports Fell 9.94% YoY in January-February 2026
47 mins ago
China’s Brass Bar Imports Fell 9.94% YoY in January-February 2026
Read More
China’s Brass Bar Imports Fell 9.94% YoY in January-February 2026
China’s Brass Bar Imports Fell 9.94% YoY in January-February 2026
According to the latest customs data, in January 2026, China’s imports of copper-zinc alloy (brass) bars and rods were 2,050.01 mt in physical content, down 8.37% MoM and up 24.53% YoY. In February, China’s imports of copper-zinc alloy (brass) bars and rods were 1,344.87 mt in physical content, down 34.4% MoM and down 36.67% YoY, showing an overall sharp decline. Cumulative imports in January-February 2026 were 3,394.87, down 9.94% YoY cumulatively. (HS codes 74072111, 74072119, 74072190).
47 mins ago
[SMM Analysis] The Mystery Behind the Flat China Sulfuric Acid FOB Price
1 hour ago
[SMM Analysis] The Mystery Behind the Flat China Sulfuric Acid FOB Price
Read More
[SMM Analysis] The Mystery Behind the Flat China Sulfuric Acid FOB Price
[SMM Analysis] The Mystery Behind the Flat China Sulfuric Acid FOB Price
Since the beginning of 2026, the global sulfur supply has been tight, with prices continuing to rise, intensifying pressure across the industrial chain. The external environment has further exacerbated the situation: ongoing turmoil in the Middle East has disrupted shipping through the Strait of Hormuz, affecting nearly 40% of global sulfur maritime transport. Shipping costs have doubled, forcing a restructuring of trade flows.
1 hour ago
Rio Tinto Targets Mid-2030s for Arizona Copper Mine, May Export Concentrate Due to US Smelting Costs
1 hour ago
Rio Tinto Targets Mid-2030s for Arizona Copper Mine, May Export Concentrate Due to US Smelting Costs
Read More
Rio Tinto Targets Mid-2030s for Arizona Copper Mine, May Export Concentrate Due to US Smelting Costs
Rio Tinto Targets Mid-2030s for Arizona Copper Mine, May Export Concentrate Due to US Smelting Costs
Rio Tinto expects Resolution Copper mine to open by mid-2030s, may export some concentrate HOUSTON, March 24 (Reuters) – Rio Tinto aims to bring its Resolution Copper project in Arizona online by the mid-2030s, but may need to export some copper concentrate due to challenging economics for smelting in the U.S., a senior executive said on Tuesday. The mining giant recently gained control of key acreage for the project after a lengthy court battle.
1 hour ago