Huaxi Nonferrous: Subsidiary Plans to Invest 1.091 Billion in Deep Mining Project for No. 100 and No. 105 Ore Bodies

Published: Mar 24, 2025 11:30
[Huaxi Nonferrous: Subsidiary Plans to Invest 1.091 Billion in Deep Mining Project for No. 100 and 105 Ore Bodies] Huaxi Nonferrous announced on the evening of March 21 that, to accelerate the company's tin resource strengthening strategy, enhance core competitiveness and sustainable development capabilities, its subsidiary Guangxi Peak Mining Co., Ltd. plans to invest in a deep mining project for the No. 100 and 105 ore bodies. The total planned investment for the project is 1.091 billion yuan. Upon reaching full production, Peak Mining's ore capacity is expected to increase from 330,000 mt per year to 450,000 mt per year.

On March 24, Huaxi Nonferrous's stock price declined. As of 11:24 am on March 24, Huaxi Nonferrous fell by 1.27%, trading at 24.82 yuan per share.

Huaxi Nonferrous announced in the evening of March 21 that to accelerate the company's tin resource chain strengthening development strategy, enhance core competitiveness and sustainable development capabilities, Peak Company plans to invest in the construction of a deep mining project for the 100+105 ore bodies, increasing ore capacity from 330,000 mt/year to 450,000 mt/year. According to the "Feasibility Study Report on the Deep Mining Project of the 100+105 Ore Bodies of Guangxi Peak Mining Co., Ltd." issued by Tongling Nonferrous Design and Research Institute Co., Ltd., the total planned investment for the project is 941,700,000 yuan, utilizing existing assets and working capital of 462,685,000 yuan, with an additional 628,256,700 yuan required, sourced from own funds and self-raised funds. The construction includes a mixed hoisting shaft, ventilation shaft, ramp, underground blind shaft, track transportation, and sludge discharge systems, among other works.

Regarding the impact of this project on the company, Huaxi Nonferrous stated:This project is a significant manifestation of the company's implementation of the "Three-Year Action Plan (2024-2026) for Enhancing the Core Competitiveness of Specialty Metal Industries and Building a First-Class Enterprise" of Guangxi Huaxi Nonferrous Metals Co., Ltd. It will further increase the production of tin, antimony, indium, lead, zinc, and silver, enhancing the company's profitability,strengthening market competitiveness and overall benefits, aligning with the long-term interests of the company and all shareholders. Peak Company will proceed with the project as planned, which is not expected to have a significant adverse effect on the company's financial and operational conditions, and there are no circumstances that would harm the interests of the company and its shareholders, especially small and medium-sized shareholders.

Huaxi Nonferrous also highlighted potential risks in the announcement: (1) Project Approval Risk: The construction of this project requires obtaining relevant permits from national ministries and local governments, and there may be a risk of not being able to implement it on schedule. To address this, the company has prioritized the acquisition of construction permits and other approval requirements, accelerating the related approval processes to strive for timely completion and commencement. (2) Safety Construction Risk: There may be various safety risks during the construction and operation of the project. In response, Peak Company has commissioned a safety pre-assessment unit to conduct a safety pre-assessment, identifying the safety risks present in the project, and implementing corresponding safety management and response measures, such as setting up a safety production management organization, enhancing employee safety training, establishing a safety risk grading control and hidden danger investigation and governance system, and a dual prevention mechanism for mines, to reduce these risks.

In its 2024 annual performance forecast, Huaxi Nonferrous previously announced that the company expects the net profit attributable to the parent company for 2024 to be between 610,000,000 yuan and 680,000,000 yuan, representing an increase of 83.91% to 105.02% compared to the same period of the previous year (after restatement).

Note: During the reporting period, the company completed the acquisition of 100% equity in Foson Company, which was included in the company's consolidated financial statements. According to the relevant provisions of the "Enterprise Accounting Standards," the company retrospectively adjusted the 2023 annual financial data disclosed, where the net profit after deducting non-recurring gains and losses for the same period of the previous year had to exclude the entire net profit of Foson Company for the same period in 2023.

For the main reasons behind the projected increase in performance, Huaxi Nonferrous announced: During the reporting period, the company achieved a substantial improvement in performance compared to the same period of the previous year, mainly due to: (1) Strengthening safety management, ensuring safe production throughout the year, laying a solid foundation for stable and high production. (2) Optimizing production processes, enhancing the balance of three-level ore volumes, improving the recovery rate of mineral processing, and boosting comprehensive utilization levels, resulting in a significant increase in production. (3)Accurately seizing the opportunity of the recovery of the nonferrous metals market, promptly adjusting business strategies, actively expanding the market, improving product quality, and achieving a rise in selling prices compared to the same period. (4) Continuously conducting special actions such as repairing and reusing old materials, and saving costs, comprehensively enhancing fine management levels, effectively improving operational efficiency and cost control capabilities. (5) Compared to the same period of the previous year (legally disclosed data), the company completed the cash acquisition of 100% equity in Foson Company during the reporting period, making Foson Company a wholly-owned subsidiary within the company's consolidated financial statements, leading to a certain degree of growth in the company's asset scale, sales revenue, and operating performance.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
On June 9, the tender prices for ferromolybdenum from two steel mills in Jiangsu and Shandong were announced.
56 mins ago
On June 9, the tender prices for ferromolybdenum from two steel mills in Jiangsu and Shandong were announced.
Read More
On June 9, the tender prices for ferromolybdenum from two steel mills in Jiangsu and Shandong were announced.
On June 9, the tender prices for ferromolybdenum from two steel mills in Jiangsu and Shandong were announced.
[Molybdenum Express] SMM, June 10: On June 9, a steel mill in Jiangsu tendered for ferromolybdenum at 12,500 yuan/mt, acceptance; on June 9, a steel mill in Shandong finalized its ferromolybdenum tender price at 312,000 yuan/mt.
56 mins ago
Chenzhi and Avatr Sign Agreement for Joint Development of Magnesium Alloy Auto Parts
2 hours ago
Chenzhi and Avatr Sign Agreement for Joint Development of Magnesium Alloy Auto Parts
Read More
Chenzhi and Avatr Sign Agreement for Joint Development of Magnesium Alloy Auto Parts
Chenzhi and Avatr Sign Agreement for Joint Development of Magnesium Alloy Auto Parts
【SMM Magnesium Brief】Recently, Chenzhi (Chongqing) Lightweight Technology Co., Ltd. and Avatr Technology (Chongqing) Co., Ltd. signed the "Magnesium Alloy Product Joint Development Agreement" in Chongqing, focusing on collaborative R&D for eight magnesium alloy products, including CCB and tailgate. Chenzhi Lightweight is equipped with 5,000-ton semi-solid die-casting equipment and possesses core technological advantages in semi-solid magnesium alloy forming and integrated die-casting. Currently, the jointly developed magnesium alloy tailgate has successfully completed production, achieving phased results. Moving forward, the two parties will prioritize joint research on core structural components such as magnesium alloy CCB and rear floor panels, driving the mass production of more high-performance magnesium alloy parts. As collaboration deepens, the application of magnesium alloy in key structural components for new energy vehicles is expected to accelerate, with the production penetration rate of semi-solid forming and integrated die-casting technologies likely to further increase.
2 hours ago
Yunnan Mining Company to Auction 150 Tonnes of Antimony Concentrate in 2026 Plan
3 hours ago
Yunnan Mining Company to Auction 150 Tonnes of Antimony Concentrate in 2026 Plan
Read More
Yunnan Mining Company to Auction 150 Tonnes of Antimony Concentrate in 2026 Plan
Yunnan Mining Company to Auction 150 Tonnes of Antimony Concentrate in 2026 Plan
SMM, June 10 — A mining development company in Yunnan is set to carry out its 2026 concentrate sales plan, conducting a public inquiry-based sale of antimony concentrate containing 150 tonnes of antimony. The starting bid coefficient is 77%, with a deposit of RMB 100,000. The transaction location is Chuxiong City, Yunnan Province. Bidding commences at 15:00 on June 12, 2026.
3 hours ago
Huaxi Nonferrous: Subsidiary Plans to Invest 1.091 Billion in Deep Mining Project for No. 100 and No. 105 Ore Bodies - Shanghai Metals Market (SMM)