On August 9, the bid announcement for the storage system procurement (with separation of evaluation and award) of the 200MW/400MWh shared energy storage demonstration project of Guyuan Changli Integrated Energy Service Co., Ltd. was released. The project tenderer is Changxia Electric Power Engineering (Anhui) Co., Ltd., and the project is located in Yuanzhou District, Guyuan City, Ningxia.
Results of bid evaluation (audit) (without ranking the bid award candidates):
Name of bid award candidate: BYD Auto Industry Co., Ltd.
Name of bid award candidate: Envision Energy Co., Ltd.
Name of bid award candidate: Beijing Hyperstar Technology Co., Ltd.
![[Pin thể rắn: Tianneng Co., Ltd. đạt quy mô giao hàng pin bán thể rắn 314Ah, với các đột phá theo từng cấp độ trên nhiều hệ thống công nghệ]](https://imgqn.smm.cn/usercenter/JmyWy20251217171729.png)
![[Pin thể rắn: EcoPro BM xây dựng đội ngũ pin thể rắn bao phủ toàn bộ chuỗi “Nguyên liệu thô – Vật liệu – Tế bào pin,” mục tiêu thương mại hóa vào năm 2027]](https://imgqn.smm.cn/usercenter/JMINH20251217171728.jpg)
![[Lưu trữ năng lượng: Chuneng ký bốn thỏa thuận khi 20 công ty lưu trữ Trung Quốc nhắm tới Nam Mỹ]](https://imgqn.smm.cn/usercenter/zWZVI20251217171730.jpg)