SMM Steel Mills Weekly Maintenance Statistics

Đã xuất bản: Jun 25, 2024 15:35
Nguồn: SMM
SMM estimates that 1.0221 million mt of pig iron output will be lost from blast furnace maintenance during Jun 22-28, down 31,900 mt on a weekly basis.

SMM estimates that 1.0221 million mt of pig iron output will be lost from blast furnace maintenance during Jun 22-28, down 31,900 mt on a weekly basis. SMM estimates that 899,900 mt of pig iron output will be lost from blast furnace maintenance during Jun 29-July 5, down 122,200 mt on a weekly basis.

Rebar: 1.0212 million mt of output will be lost from maintenance during Jun 22-28, down 116,700 mt on a weekly basis; 908,700 mt of output will be lost from maintenance during Jun 29-July 5, down 112,500 mt on a weekly basis.

HRC: 148,500 mt of output will be lost from maintenance during Jun 22-28, down 5,000 mt on a weekly basis; 73,500 mt of output will be lost from maintenance during Jun 29-July 5, down 75,000 mt on a weekly basis.

Medium-thickness plate: 0 mt of output will be lost from maintenance during Jun 22-28, flat on a weekly basis; 80,000 mt of output will be lost from maintenance during Jun 29-July 5, up 80,000 mt on a weekly basis.

Tuyên bố về Nguồn Dữ liệu: Ngoại trừ thông tin công khai, tất cả dữ liệu khác được SMM xử lý dựa trên thông tin công khai, giao tiếp thị trường và dựa trên mô hình cơ sở dữ liệu nội bộ của SMM. Chúng chỉ mang tính chất tham khảo và không cấu thành khuyến nghị ra quyết định.

Để biết thêm thông tin hoặc có thắc mắc gì, vui lòng liên hệ: lemonzhao@smm.cn
Để biết thêm thông tin về cách truy cập báo cáo nghiên cứu, vui lòng liên hệ:service.en@smm.cn