SMM Steel Mills Weekly Maintenance Statistics

Đã xuất bản: Jun 19, 2024 10:41
Nguồn: SMM
SMM estimates that 1.0474 million mt of pig iron output will be lost from blast furnace maintenance during Jun 15-21, up 5,600 mt on a weekly basis.

SMM estimates that 1.0474 million mt of pig iron output will be lost from blast furnace maintenance during Jun 15-21, up 5,600 mt on a weekly basis. SMM estimates that 911,200 mt of pig iron output will be lost from blast furnace maintenance during Jun 22-28, down 136,200 mt on a weekly basis.

Rebar: 1.0924 million mt of output will be lost from maintenance during Jun 15-21, down 46,300 mt on a weekly basis; 919,900 mt of output will be lost from maintenance during Jun 22-28, down 172,500 mt on a weekly basis.

HRC: 128,500 mt of output will be lost from maintenance during Jun 15-21, down 56,100 mt on a weekly basis; 38,500 mt of output will be lost from maintenance during Jun 22-28, down 90,000 mt on a weekly basis.

Tuyên bố về Nguồn Dữ liệu: Ngoại trừ thông tin công khai, tất cả dữ liệu khác được SMM xử lý dựa trên thông tin công khai, giao tiếp thị trường và dựa trên mô hình cơ sở dữ liệu nội bộ của SMM. Chúng chỉ mang tính chất tham khảo và không cấu thành khuyến nghị ra quyết định.

Để biết thêm thông tin hoặc có thắc mắc gì, vui lòng liên hệ: lemonzhao@smm.cn
Để biết thêm thông tin về cách truy cập báo cáo nghiên cứu, vui lòng liên hệ:service.en@smm.cn
SMM Steel Mills Weekly Maintenance Statistics - Shanghai Metals Market (SMM)